Title Page
-
Project Name
-
Client
-
Have all actions from last inspection been closed out? (Review on iAuditor with PM)
-
Conducted on
-
Prepared by
-
Location
-
Project Manager
-
Site Manager
-
Have any accidents/incident/near misses occurred site the last inspection?
-
Were correct reporting procedures followed?
Minimum Standards
-
Bucket Changing Area established to Minimum Standard?
-
Dust Management: Minimum Standard implemented?
-
Are Minimum Standards for Excavations established?
-
Is the Minimum Standard for Marking Out Buried Services being followed?
-
Is Correct Use of Small Powered Tools Minimum Standard evident?
Project Control
-
Do Project and Site Management team (including supervisors) have correct CSCS card and appropriate SMSTS/SSSTS certification?
-
Are RAMS applicable for the current work activities available? Prepared using the HandsHQ system and Reviewed within the last 3 months?
-
Has a (minimum) weekly Site Observation Sheet (SOS) been completed by a member of the Management Team?
-
Is there a HSMS folder set up accessible on site?
-
Are weekly PUWER checks being recorded?
-
Are daily and weekly plant inspections being carried out?
-
Are weekly LOLER checks being recorded?
-
Is the PAT Register completed, with all items recorded?
-
Are Section 61, Permit to Discharge etc. in place where required?
-
Is the muck away log being maintained?
-
Is the delivery to site log completed (aggregates/ topsoil)?
-
Are drainage tests being completed and test sheets filled out correctly?
-
Are CoSHH assessments available for all CoSHH products on site?
-
Are HAVS record sheets been completed?
-
Are Manual Handling assessments available for materials/equipment on site?
-
Have operatives received Manual Handling training?
Access/Egress (Including Tammet step systems)
-
Are segregated pedestrian routes established to, through and around the work area?
-
Is appropriate directional signage displayed?
-
Are suitable arrangements in place for access to delivery vehicles?
-
Are all Tammet steps tagged, with valid inspections in place?
-
Are the Tammet steps secured, footed, appropriate for location and installed according to the manufacturer's instructions?
Fire & Emergency Arrangements
-
Are hot work permits in place with a minimum of 2 x Extinguishers provided?
-
Are all fire extinguishers in a serviceable condition, fully pressurised with retaining pins in place?
-
Are suitable numbers of trained First Aiders available for current operatives?
-
Is the First Aid kit fully stocked, with 'task specific' 1st Aid items available if required (Eye Wash stations, burns station etc.)?
Excavations
-
Has a Permit to Dig been issued, appropriate for the location of the excavation?
-
Is the Excavation Inspection Register being completed Daily?
-
Is a Cable Avoidance Tool, minimum 'g C.A.T.4+', and Genny available?
-
Who is the operative trained in use of C.A.T. & Genny? Expiry Date of Service Avoidance Training?
-
Are all excavations protected with an adequate means of edge protection, with any barriers a minimum of 1m from excavation edge?
-
Are the excavations battered, adequately stepped or supported using the correct proprietary or TW designed system?
-
Is there safe and suitable access into and egress from the excavation?
Manhole/Floor Voids
-
Is Minimum Standard ‘Lifting Gatic Service Covers’ followed where applicable?
-
Are all small holes, manholes and voids covered?
-
Are all covers secured to prevent inadvertent movement?
-
Are any covers highlighted/ protected, to provided visual indicators to others?
Housekeeping
-
Are the materials storage areas designated, planned and well controlled, with suitable access?
-
Are sufficient Rubble Trucks and Waste Skips available on site?
-
Are all areas cleared as works progress, free of slip/trip hazards and good Housekeeping regime implemented?
Lifting Operations
-
Do slinger/signallers have All Types/All Duty CPCS endorsements?
-
Are Lifting Operations being undertaken in line with the Lift Plan and Schedule of Common Lifts?
-
Are all loads being landed correctly: Not causing an obstruction, Lifting Accessories removed, on timber 'bites' where required, stable - on firm/level ground?
-
Are all Lifting Accessories in good condition, free from damage, inspected and tagged?
-
Is appropriate storage available for the Lifting Accessories, and being utilised?
-
Tag lines used when carrying out lifts?
Temporary Works
-
Has TWS/TWC been appointed for the project where applicable?
-
Are designs available for any Temporary Works on site?
-
Are all TW installed to design?
-
Has TW procedure been followed?
Tools, Lighting, Electrical Supply and Equipment
-
Are Tools & Equipment in good condition, free from defects?
-
Do all drills have auxiliary handles fitted?
-
Is there sufficient task lighting in place where required?
-
Are 110v extension cables, transformers and splitter boxes in good condition and controlled, with tool/equipment leads in safe locations, not presenting trip/damage hazard?
-
Are Whip Checks utilised at all compressors, hoses, and associated tools/equipment connections?
Mechanical Plant
-
Is all plant and equipment free from damage?
-
Are all lights, beacons and audible warnings operational?
-
Are Roll Bars in place, with retaining pins secured?
-
Is all plant (excavators, rollers, dumpers) parked on firm level ground and locked, with keys removed when not in use?
-
Are seatbelts being worn when plant is being operated.
-
Are banksmen and traffic marshalls available for the control of plant and vehicle movements?
Environmental
-
Are all CoSHH items stored correctly?
-
Is disposal of CoSHH waste controlled and well managed?
-
Are drip trays in place beneath all static plant and CoSHH materials?
-
Are Plant nappies/Drip trays in place at fuel storage and refuelling points for small mobile plant?
-
Are spill kits available on site?
PPE
-
Is mandatory PPE being worn by all Modebest site operatives?
-
Is PPE in good condition and being worn correctly?
-
Is the correct task specific PPE being worn in line with RA control measures?
-
Is hearing protection available where noise is >80db?
-
Is wearing of hearing protection enforced where noise is >85db?
-
Are all operatives required to wear RPE FaceFit tested?
Welfare
-
Are suitable toilet and washing facilities available on site?
-
Is access provided to clean drinking water and facilities available to heat food, with sufficient space to eat?
-
Are changing facilities available, with provision to dry clothes and store personal belongings?