Title Page

  • Project Name

  • Client

  • Contract Manager

  • Project Manager

  • Have all actions from last inspection been closed out? (*Review on iAuditor with PM)

  • Conducted on

  • Prepared by

  • Location

Accident/Incidents/Near Misses

  • Have any accidents/incident/near misses occurred site the last inspection?

  • Were Modebest Reporting Procedures followed and all necessary investigation elements completed within the specified timeframe?

Inspections

  • Have all issues identified during previous inspection been closed out?

  • Was close out form returned to the H&S Dept., along with supporting evidence?

  • Has a (minimum) weekly Site Observation Sheet (SOS) been completed by a member of the Management Team?

RAMS, Rescue Plans, Statutory Paperwork

  • Are RAMS applicable for the current work activities available?

  • Have all applicable RAMS been reviewed within the last 3 months, and re-briefed where required?

  • Have the RAMS been prepared using the HandsHQ system?

  • Is Working at Height Rescue Plan available?

  • Are trained/competent persons available to execute the plan?

  • Is Tower Crane Rescue Plan available?

  • Are trained/competent persons available to execute the plan?

  • Is Slip Form Rescue Plan available?

  • Are trained/competent persons available to execute the plan?

  • Are all Rescue Plans reviewed, in date and briefed?

  • Is the PUWER Register being completed correctly, at min. weekly intervals, with all required items recorded?

  • Is the LOLER Register being completed correctly, at min. weekly intervals, with all required items recorded?

  • Is the PAT Register being completed correctly, at min. weekly intervals, with all required items recorded?

  • Are weekly plant inspections completed?

  • Is the Excavation Inspection Register being completed Daily?

  • In the Edge/Elevation guard Inspection Register being completed weekly, with each Block/Level/Elevation/Opening recorded separately?

  • Are Section 61, Permit to Discharge etc. in place?

Training

  • Is a Project Training Matrix prepared and maintained?

  • Do all operatives hold the relevant competency card for the job they are carrying out?

  • Do all operatives working at height have in date Harness Training & Working at Height Training?

  • Where required (carpenters, concrete finishers etc.) do operatives have FaceFit training for the RPE available on site?

  • Have operatives installing Edgeguard received training from Vertemax?

  • Have operatives installing Peri-up received training from Peri?

  • Do all operatives carrying out works using Scissor Lifts have required IPAF training?

  • Do Project and Site Management team (including supervisors) have correct CSCS card and appropriate SMSTS/SSSTS certification?

Welfare Arrangements

  • Are welfare facilities provided compliant with CDM 2015?

  • Sufficient Toilets available for site numbers?

  • Separate female toilet available?

  • Drying rooms available sufficient for number of people on site?

  • Are suitable numbers of trained First Aiders available for current operatives?

  • Is the First Aid kit fully stocked?

  • Are 'task specific' 1st Aid items available if required (Eye Wash stations, burns station etc.)?

  • Are contact details displayed for trained First Aiders?

  • Access provided to clean drinking water?

  • Facilities available to heat food, with sufficient space to eat?

Temporary Works

  • Has a TWS/TWC been appointed for the project, with appointment letters held in the TW folder?

  • Is the TW folder in place and is there evidence of regular updates on the HSMS 'P'Drive?

  • Is the TW folder being completed to the required standard?

Quality

  • Is there a HSMS folder set up accessible on site?

  • Is a Quality & Management file on site and is it maintained?

  • Is the muck away log being maintained

  • Is the delivery to site log completed ( aggregates/ topsoil)

  • Is the Modebest format site diary being completed/up-to date?

  • Are drainage tests being completed and test sheets filled out correctly?

  • Are cube tests been carried out and recorded?

  • Is the cube store temperature log being maintained?

The templates available in our Public Library have been created by our customers and employees to help get you started using SafetyCulture's solutions. The templates are intended to be used as hypothetical examples only and should not be used as a substitute for professional advice. You should seek your own professional advice to determine if the use of a template is permissible in your workplace or jurisdiction. You should independently determine whether the template is suitable for your circumstances.