Title Page
-
Project Name
-
Client
-
Contract Manager
-
Project Manager
-
Have all actions from last inspection been closed out? (*Review on iAuditor with PM)
-
Conducted on
-
Prepared by
-
Location
Accident/Incidents/Near Misses
-
Have any accidents/incident/near misses occurred site the last inspection?
-
Were Modebest Reporting Procedures followed and all necessary investigation elements completed within the specified timeframe?
Inspections
-
Have all issues identified during previous inspection been closed out?
-
Was close out form returned to the H&S Dept., along with supporting evidence?
-
Has a (minimum) weekly Site Observation Sheet (SOS) been completed by a member of the Management Team?
RAMS, Rescue Plans, Statutory Paperwork
-
Are RAMS applicable for the current work activities available?
-
Have all applicable RAMS been reviewed within the last 3 months, and re-briefed where required?
-
Have the RAMS been prepared using the HandsHQ system?
-
Is Working at Height Rescue Plan available?
-
Are trained/competent persons available to execute the plan?
-
Is Tower Crane Rescue Plan available?
-
Are trained/competent persons available to execute the plan?
-
Is Slip Form Rescue Plan available?
-
Are trained/competent persons available to execute the plan?
-
Are all Rescue Plans reviewed, in date and briefed?
-
Is the PUWER Register being completed correctly, at min. weekly intervals, with all required items recorded?
-
Is the LOLER Register being completed correctly, at min. weekly intervals, with all required items recorded?
-
Is the PAT Register being completed correctly, at min. weekly intervals, with all required items recorded?
-
Are weekly plant inspections completed?
-
Is the Excavation Inspection Register being completed Daily?
-
In the Edge/Elevation guard Inspection Register being completed weekly, with each Block/Level/Elevation/Opening recorded separately?
-
Are Section 61, Permit to Discharge etc. in place?
Training
-
Is a Project Training Matrix prepared and maintained?
-
Do all operatives hold the relevant competency card for the job they are carrying out?
-
Do all operatives working at height have in date Harness Training & Working at Height Training?
-
Where required (carpenters, concrete finishers etc.) do operatives have FaceFit training for the RPE available on site?
-
Have operatives installing Edgeguard received training from Vertemax?
-
Have operatives installing Peri-up received training from Peri?
-
Do all operatives carrying out works using Scissor Lifts have required IPAF training?
-
Do Project and Site Management team (including supervisors) have correct CSCS card and appropriate SMSTS/SSSTS certification?
Welfare Arrangements
-
Are welfare facilities provided compliant with CDM 2015?
-
Sufficient Toilets available for site numbers?
-
Separate female toilet available?
-
Drying rooms available sufficient for number of people on site?
-
Are suitable numbers of trained First Aiders available for current operatives?
-
Is the First Aid kit fully stocked?
-
Are 'task specific' 1st Aid items available if required (Eye Wash stations, burns station etc.)?
-
Are contact details displayed for trained First Aiders?
-
Access provided to clean drinking water?
-
Facilities available to heat food, with sufficient space to eat?
Temporary Works
-
Has a TWS/TWC been appointed for the project, with appointment letters held in the TW folder?
-
Is the TW folder in place and is there evidence of regular updates on the HSMS 'P'Drive?
-
Is the TW folder being completed to the required standard?
Quality
-
Is there a HSMS folder set up accessible on site?
-
Is a Quality & Management file on site and is it maintained?
-
Is the muck away log being maintained
-
Is the delivery to site log completed ( aggregates/ topsoil)
-
Is the Modebest format site diary being completed/up-to date?
-
Are drainage tests being completed and test sheets filled out correctly?
-
Are cube tests been carried out and recorded?
-
Is the cube store temperature log being maintained?