Title Page
-
Project Name
-
Client
-
Contract Manager
-
Project Manager
-
Have all actions from last inspection been closed out, with supporting Evidence? (*Review on iAuditor with PM)
-
Minimum Weekly SOS (Sight Observation Sheet) conducted by Project Management Team?
-
Conducted on
-
Prepared by
-
Location
Accident/Incidents/Near Misses
-
Have any accidents/incident/near misses occurred site the last inspection?
-
Were Modebest Reporting Procedures followed and all necessary investigation elements completed within the specified timeframe?
RAMS & Rescue Plans
RAMS & Rescue Plans
-
Are RAMS applicable for the current work activities available, with register maintained?
-
Have all applicable RAMS been reviewed within the last 3 months, and re-briefed where required?
-
Have the RAMS been prepared using the HandsHQ system?
-
Are, or will, any Subcontractors carrying out work for Modebest on site?
-
Has the Subcontractor RAMS approval process been followed?
-
Have requirements for a Subcontractor 'Friday Pack' been established?
-
Is a Subcontractor Audit required?
-
Is Working at Height Rescue Plan available?
-
Are trained/competent persons available to execute the plan?
-
Is Tower Crane Rescue Plan available?
-
Are trained/competent persons available to execute the plan?
-
Is Slip Form Rescue Plan available?
-
Are trained/competent persons available to execute the plan?
-
Is an Excavations and Confined Space Rescue Plan available?
-
Are trained/competent persons available to execute the plan?
-
Are all Rescue Plans reviewed, in date and briefed?
Lifting Operations
-
Are Lift Plans available for all lifting activities (excavator, tower crane, lorry loader, telehandler etc.)
-
Is the LOLER Register being completed correctly, at min. weekly intervals, with all required items recorded?
-
Have 'lifting competencies' been completed for all members of the lifting team?
-
Are Tower Crane daily/weekly checks being completed?
-
Are SMIE and Free Slew registers being completed for Tower Cranes?
Statutory Paperwork
-
Is the PUWER Register being completed correctly, at min. weekly intervals, with all required items recorded?
-
Is the PAT Register available, with all required items recorded?
-
Are weekly plant inspections completed?
-
Is the Excavation Inspection Register being completed Daily?
-
In the Edgeguard Inspection Register being completed weekly, with each Block/Level/Elevation/Opening recorded separately?
-
Are Section 61, Section 278, Permit to Discharge etc. in place?
Training
-
Is a Project Training Matrix prepared and maintained?
-
Do all operatives hold the relevant competency card for the job they are carrying out?
-
Do all operatives working at height have in date Harness Training & Working at Height Training?
-
Where required (carpenters, concrete grinding/sanding etc.) do operatives have FaceFit training for the RPE available on site?
-
Have operatives installing Edgeguard received training from Vertemax?
-
Have operatives installing Peri-up received training from Peri?
-
Where Catch Fans are to be/installed, are trained operatives available?
-
Where Canti-deck are to be/installed, are trained operatives available?
-
Where Screens (RMD) are to be/installed, are trained operatives available?
-
Do all operatives carrying out works using Scissor Lifts have required IPAF training?
-
Do Project and Site Management team (including supervisors) have correct CSCS card and appropriate SMSTS/SSSTS certification?
Welfare Arrangements
-
Are welfare facilities provided compliant with CDM 2015?
-
Sufficient Toilets available for site numbers?
-
Separate female toilet available?
-
Drying rooms available sufficient for number of people on site?
-
Are suitable numbers of trained First Aiders available for current operatives?
-
Is the First Aid kit fully stocked?
-
Are 'task specific' 1st Aid items available if required (Eye Wash stations, burns station etc.)?
-
Are contact details displayed for trained First Aiders?
-
Access provided to clean drinking water?
-
Facilities available to heat food, with sufficient space to eat?
Temporary Works
-
Has a TWC/TWS been appointed for the project, with appointment letters held in the TW Folder?
-
Is the TW Folder established, completed correctly, maintained and with evidence of regular updates on the HSMS 'P'drive?
Quality
-
Are the HSMS folders set up and accessible on site?
-
Is the Quality & Management file (Folder 9) maintained on site?
-
Is the Muck Away Log being maintained?
-
Is the delivery to site log being completed (aggregates, topsoil etc.)?
-
Are Drainage Tests being completed, with test sheets filled out correctly?
-
Are concrete cube tests being carried out and recorded?
-
Is the cube store temperature log being maintained?
-
Is the Modebest format Site Diary being completed, and is it up to date?
Summary
-
Summary of Inspection Findings: