Information
-
Audit Title
-
Document No.
-
Client / Site
-
Conducted on
-
Prepared by
Traffic Light
-
Red - An intolerable risk exists. This risk is unacceptable and has the potential for a serious event or an enforcement notice. The activity is to be halted until risk controls are implemented. A score below 70%.<br><br>Amber - Low to Moderate risks exist. Improved risk controls are to be implemented urgently within defined time periods. A score below 85%<br><br>Green - None to low risks exist. Appropriate risk controls are in place, or have been agreed and implemented.<br>
-
Location
-
Personnel
General
Documentation
-
Is the Project Management Plan / Construction Phase Plan in place?
-
Are the Risk Assessments and Method Statements correct and up to date?
-
Are relevant Permits to Work in place and being used correctly?
-
Have all incidents and near misses been reported and investigated as appropriate?
-
Any other comments?
Training and Behaviours
-
Are suitable training / qualifications in place for managers, supervisors & operatives for health and safety (Employees and Sub-Contractors)?
-
Competent for nominated roles?
-
Plant operators including CPCS cards / log book?
-
Are site inductions correct and up to date?
-
Are daily briefings correct and up to date?
-
Are Toolbox Talks correct and up to date?
-
Is the behaviour on site acceptable to AYM standards / expectations?
-
Any other comments?
Welfare
-
Are toilets and wash stations available and clean?
-
Are provisions for eating and preparing food available? (If AYM have provided units are they clean and tidy)
-
Are changing facilities available? (If applicable to the type of project)
-
Are first aid provisions available and correctly stocked?
-
Is PPE being correctly worn? (Boots and Hi-Vis are mandatory, any thing else is RAMS specific)
-
Any other comments?
Health
Manual Handling
-
Are manual handling operations being carried out in the correct manner?
-
Have manual handling operations been reduced as far as reasonably practicable?
-
Have the manual handling operations been justified and detailed within RAMS?
-
Have all individuals received manual handling training?
-
Is the surrounding area clear and tidy?
-
Any other comments or controls required?
Hazardous Substances (Inc Dust)
-
Has the least hazardous substance / process been used? (where reasonably applicable)
-
Controls in place / evident? (Extraction, secure storage etc)
-
Correct RPE being used? ( FFP3 minimum)
-
Class H or M Vacuum to clear dust / debris? (if applicable)
-
Any other comments?
Lead
-
Are all lead locations known?
-
Is there a suitable COSHH assessment in place?
-
Are suitable / adequate provisions in place for washing?
-
Any other comments?
Asbestos
-
Has an asbestos R&D survey been undertaken and locations known / identified? (If an R&D survey is required, failed response is automatic site shut down)
-
Are accidental exposure arrangements in place and communicated to work force? (i.e. covered in induction or toolbox talk)
-
Is the removal contractor suitably licensed? (if applicable)
-
Has the HSE notification been issued? (if applicable)
-
Are waste arrangement in order?
-
Is clearance arrangements in order? (4 stage etc)
-
Any other comments?
Noise
-
Over 80dB - Noise assessment been carried out?
-
Over 85dB - Ear protection zone in place?
-
Is correct ear protection being worn?
-
Any other comments?
Vibration
-
Have exposure levels been obtained / risk assessed?
-
If there is high exposure, is suitable job rotation in place with operatives?
-
Any other comments?
Microbiological Hazards
-
Has suitable risk assessment been carried out for weals disease and legionella? (if applicable)
-
Have arrangements / controls been put in place where there is risk of Weals disease or legionella? (if applicable)
-
Any other comments?
Safety
Vehicle & Plant Movement
-
Are routes suitably identified, safe and clear?
-
Have vehicle and plant routes been suitably segregated? (if applicable)
-
Are vehicle marshals suitably trained? (if applicable)
-
Any other comments?
Public
-
Has fencing / hoarding been installed correctly and safely? (if applicable)
-
Has suitable safety signage been installed correctly?
-
Have materials been stored securly and neatly?
-
Have suitable site vehicle movement signs / notices been displayed for members of the public correctly?
-
Any other comments?
Flammable Substances / Fire
-
Has a suitable fire risk assessment been carried out?
-
Have control measures been implemented correctly?
-
Is there a suitable fire evaluation plan in place?
-
A suitable method of raising the alarm?
-
Have fire points been placed correctly and is equipment in suitable condition / working order? (have extinguishers been provided / services correctly etc.)
-
Have escape routes been cleared signed / identified?
-
Are escape routes kept clean and free of obstruction?
-
Have fire drills been carried out as required? (if applicable)
-
Any other comments?
Underfoot Conditions
-
Free from trip hazards, cables etc?
-
Openings in the floor / ground have been suitably covered and made safe?
-
Suitable footwear is being used?
-
Any other comments?
Working At Height - General
-
Use of ladders justified, inspected and in correct working order?
-
Temporary platforms / podiums inspected and in correct working order?
-
Temporary edge protection is greater than 950mm high and with caps less than 470mm?
-
Work restraint / fall arrest system - harness and lanyards being used correctly? (if applicable)
-
Work restraint / fall arrest system - harness and lanyards inspected and in correct working order? (if applicable)
-
Work restraint / fall arrest system - recovery plan in place? (if applicable)
-
Have proprietary gates to lift shaft door openings been installed correctly? (if applicable)
-
Are suitable falling object controls in place? e.g. tools tethered (if applicable)
-
Any other comments?
Working At Height - Scaffolding
-
Scaff tags used and in order?
-
Are scaffolders suitably qualified for the task at hand? (if specialist design scaffold, is there an advanced scaffolder present? etc.)
-
Has the scaffold been installed to TG20?
-
Have the relevant SG been followed?
-
Have inspections been undertaken weekly?
-
Have all non-compliance items from the weekly inspection been corrected / addressed?
-
Has the correct signage been installed to the scaffold?
-
Loading bay weight restrictions and scaffold load capability have been adhered to? (i.e. the scaffold hasn't been overloaded)
-
The scaffold generally appears to be in suitable working order?
-
Any other comments?
Working At Height - MEWP
-
Is the ground area firm and level / suitable for the MEWP?
-
Is the operator qualified?
-
Is the correct PPE being worn? (Harness etc.)
-
Is an emergency plan in place?
-
Has the plant been inspected as required? Is there evidence to demonstrate?
-
Any other comments?
Services (Buried / Overhead)
-
Are locations known and proven?
-
Has locations been marked out? (chalk / spray paint etc)
-
Have ground disturbance permits been issued and used correctly?
-
Are overhead cable controls in place? (are they suitably secured / identified for vehicles etc)
-
Any other comments?
Excavations
-
Have trenches been supported correctly?
-
For excavations greater than 1.5m deep, are safe systems of work in place and implemented?
-
Is there suitable edge protection / stop blocks in place?
-
For excavations great than 3m, are emergency plans in place?
-
Any other comment?
Plant & Machinery
-
Is plant suitable for the task at hand?
-
Has the plant been correctly inspected and maintained as required?
-
Are protection guards in place / functioning correct? (if applicable)
-
Is the operator suitably competent to operate?
-
Is the operator qualified to operate? (if applicable)
-
Any other comments?
Electricity
-
Have permits to work / isolate been correctly implemented and used?
-
Have electrics been "locked off and tagged off" correctly? (if applicable)
-
Where electrical works are being undertaken, are these being carried out by qualified and competent electricians?
-
Have site supplies and 110v equipment been inspected and tested every 3 months?
-
Have site 240v equipment and lighting equipment been inspected and tested every 1 months?
-
Have site 110v and battery tools been inspected and tested as required?
-
Are live distribution boards and panels secure and locked? (if applicable)
-
Have temporary electrics been installed neatly and correctly?
-
Any other comments?
Confined Spaces (if applicable)
-
Is there a suitable safe system of work in place?
-
Is there an emergency plan in place?
-
Is suitable PPE / RPE in place?
-
Any other comments?
Demolition / Strip Out
-
Are competent operatives / contractor undertaking the works?
-
Are safe and suitable safe systems of work in place?
-
Have any temporary works requirements been addressed correctly? (e.g. if a wall is coming out, has the correct temporary propping been used etc.)
-
Have services been isolated correctly?
-
Have any live services / cables that are remaining been clearly identified to operatives? (e.g. fibre optic cables that can't be isolated / decommissioned etc.)
-
Any other comments?
Inclement / Extreme Weather
-
Have suitable control measures and precautions been implemented? (e.g. an extreme weather warning has been issued, have materials been secured / made safe to avoid flying around etc.)
-
Any other comments?
Environmental
General
-
Have environmental risk assessments been undertaken?
-
Have environmental controls been incorporated into RAMS for current activities?
-
Have relevant environmental tool box talks been delivered?
-
Has a suitable environmental emergency plan briefing been undertaken?
-
Any other comments?
Waste
-
Is waste stored security in suitable containers?
-
Is waste segregated into separate major waste streams? (if applicable to project)
-
Are waste transfer notes correctly completed?
-
Any other comments?
Use Of Energy And Water
-
Energy efficient on-site generation installed (e.g. eco welfare generator etc)
-
Heating and lighting turned off when not in use?
-
No water leaks observed
-
Rainwater reuse system in place? (if applicable)
-
Any other comments?
Raw Materials
-
Materials stored correctly to prevent damage / spoilage?
-
Timber from approved source? (FSC or equivalent)
-
Paper from approved source? (FSC or equivalent)
-
Chain of custody paperwork provided with deliveries?
-
Any other comments?
Nuisance
-
Site working hours adhered to?
-
Are there suitable controls in place to deal with mud on road? e.g. roads regularly washed down or tyre wash station prior to leaving site (if applicable)
-
Is parking / access controlled suitably?
-
Fencing / site compound neat and tidy?
-
Is housekeeping inline with AYM requirements?
-
Security lighting is unobstructed and suitable?
-
Any other comments?
Discharge To Water & Land?
-
Has a permit to pump been issued for pumping operations? (if applicable)
-
Is a water board discharge license in place? (if applicable)
-
Monitoring of discharges undertaken in line with permit / license requirements?
-
Fuel / oil store has been stored correctly?
-
Chemicals have been stored correctly?
-
Spill kits available?
-
Liquids stored away from watercourses / drains?
-
Any other comments?
Specialist
-
Has surveys / testing for contaminated land been completed?
-
Is a Section 61 agreement in place?
-
Have complaints been reviewed, responded to and actioned where required?
-
Any other comments?
Comments
-
Executive Summary
-
Forward Planning
-
Best Practices / Initiatives for Sharing