Information
-
Conducted on
-
Conducted by
-
Audit Attendees
-
signature
Non conforming material
-
Have action items from previous audit been completed?
-
Observation:
-
Are rejected material clearly identified wirh ncmr tags with complete information?
-
Observation:
-
Are the rejected material sitting in ncmr area less than 2 days?
-
Observation:
-
Are non conforming material segregated from good inventory?
-
Observation:
Material Presentation & Tools
-
Are bins/ Totes/ boxes/ properly labeled? Specify # of items checked.
-
Observation:
-
Are the gauges or other measuring devices calibrated with current calibration label? Specify # of items checked?
-
Observation:
Documentation
-
Are Proc-doc/Print/AR file up to date?
-
Observation:
-
Are production alert/quality alert within expiration date?
-
Observation:
-
Is the operator training matrix up to date? Specify the date last updated.
-
Observation:
Assembly Environment
-
Are team board & 5s board (if any) updated with all current and required information?
-
Observation:
-
Is operator using tool shadow board to place tools, if there is any?
-
Observation:
-
Other observations (cleanliness etc)
-
Observation: