Title Page
-
Conducted on
-
Site Completed by:
-
Location
-
Job Number
-
Customer
-
Audit Conducted by:
Audit Section
-
Any Broken or rocking slabs?
-
Site cleared from rubbish and debris?
-
Paint lines been replaced where needed?
-
Have 150 rules be adhered to?
-
Have 250 rules been adhered to?
-
Duct is laid to the specified depth (FW/VERGE Pass 250mm or CW 450mm cover)
-
Ducting is cut flush to Wall
-
Core drill and pointed
-
Duct is >150mm from the chamber floor
-
Duct is >75mm from adjacent wall
-
Duct is >50mm from other ducts
-
Draw rope/Duct sponge has been installed
-
Pointing and sealed edges been done correctly?
-
Right First Time Status
Close out
-
Auditor Remarks
-
Add signature