Title Page

  • Conducted on

  • Site Completed by:

  • Location
  • Job Number

  • Customer

  • Audit Conducted by:

Audit Section

  • Any Broken or rocking slabs?

  • Site cleared from rubbish and debris?

  • Paint lines been replaced where needed?

  • Have 150 rules be adhered to?

  • Have 250 rules been adhered to?

  • Duct is laid to the specified depth (FW/VERGE Pass 250mm or CW 450mm cover)

  • Ducting is cut flush to Wall

  • Core drill and pointed

  • Duct is >150mm from the chamber floor

  • Duct is >75mm from adjacent wall

  • Duct is >50mm from other ducts

  • Draw rope/Duct sponge has been installed

  • Pointing and sealed edges been done correctly?

  • Right First Time Status

Close out

  • Auditor Remarks

  • Add signature

The templates available in our Public Library have been created by our customers and employees to help get you started using SafetyCulture's solutions. The templates are intended to be used as hypothetical examples only and should not be used as a substitute for professional advice. You should seek your own professional advice to determine if the use of a template is permissible in your workplace or jurisdiction. You should independently determine whether the template is suitable for your circumstances.