Information

  • SITE AND TYPE OF INFORMATION IN THIS NOTE

  • LIFT DETAILS TO WHICH NOTE APPLIES TO

  • ENGINEER

  • Conducted on

  • Location
  • Prepared by

PLEASE ENSURE YOU GIVE DETAILS OF WHICH SITE / LIFT THESE NOTES REFER TO

NEW INFORMATION ABOUT SITE OR LIFT

  • Details of any new Information about Site / Lift / New Procedures to Follow etc

  • Take Photos as Needed

CODES / KEYS / ACCESS ARRANGEMENTS

  • Details of any new Codes Keys or Access Arrangements for Site or Lift etc.

  • Take Photos as Needed

REQUIRED INFORMATION

  • Details of any information you have been asked to gather about Lift or Site e.g. Part Details etc

  • Take Photos as Needed

RISK ASSESSMENT INFORMATION

  • Is there a current Risk Assessment on Site

  • Do you think a new Risk Assessment needs to be completed?

  • Does a Risk Assessment need to be placed on site

FURTHER WORK REQUIRED

  • Details of any new or further work which may required to be done on site.

  • Take Photos as Needed

ENGINEERS SIGNATURE

  • Engineer - Please Print Name and Sign

The templates available in our Public Library have been created by our customers and employees to help get you started using SafetyCulture's solutions. The templates are intended to be used as hypothetical examples only and should not be used as a substitute for professional advice. You should seek your own professional advice to determine if the use of a template is permissible in your workplace or jurisdiction. You should independently determine whether the template is suitable for your circumstances.