Title Page
-
Completed forms are to be kept readily available (preferably on site) for the duration of construction works, after which time shall form part of the CDM Health and Safety file.
-
Sensible Monitoring Audit Completed By:
-
Site Manager:
-
Contract Number:
-
Project Title:
-
Conducted on
Office
-
Any H&S actions identified shall be entered onto Audit / Inspection Action Log and brought to the urgent attention of the appropriate personnel as soon as possible. Contractor / Project Manager to be notified of actions required / taken.
-
1) Are the Emergency Procedures available on site?<br>a) Are all persons aware of them?
-
Comments:
-
Attach any images relevant to question 1 here.
-
2) Have all persons been inducted to the project?
-
Comments:
-
Attach any images relevant to question 2 here.
-
3) Are the welfare facilities adequate and is there appropriate first aid provision on site?<br>(numbers of appointed persons / first aiders, location / contents of kit)
-
Comments:
-
Attach any images relevant to question 3 here.
-
4) Have the workforce been informed as to the location of first aid provisions?
-
Comments:
-
Attach any images relevant to question 4 here.
-
5) Is the accident book up to date and filled in correctly?
-
Comments:
-
Attach any images relevant to question 5 here.
-
6) Is the accident reporting procedure covered during inductions?
-
Comments:
-
Attach any images relevant to question 6 here.
-
7) Are the offices tidy and free from trip hazards and is there safe access and egress available for all?
-
Comments:
-
Attach any images relevant to question 7 here.
-
8) Are visitor instructions clear and well signed
-
Comments:
-
Attach any images relevant to question 8 here.
-
9) Is the visitor book being used?
-
Comments:
-
Attach any images relevant to question 9 here.
-
10) Has the fixed wiring system been tested?
-
Comments:
-
Attach any images relevant to question 10 here.
-
11) Has portable electrical equipment (including cables and leads) been tested, tagged, recorded and are records available?
-
Comments:
-
Attach any images relevant to question 11 here.
-
12) Are the available fire extinguishers of the correct type, easily accessible, in date and charged?
-
Comments:
-
Attach any images relevant to question 12 here.
-
13) Has training of Fire Marshalls and use of extinguishers been given?
-
Comments:
-
Attach any images relevant to question 13 here.
-
14) Are the emergency procedures and assembly point displayed?
-
Comments:
-
Attach any images relevant to question 14 here.
-
15) Have Fire Risk Assessments been completed?
-
Comments:
-
Attach any images relevant to question 15 here.
-
16) Is there a fire alarm/ other means for raising the alarm?<br>(Fire alarm to have been tested)
-
Comments:
-
Attach any images relevant to question 16 here.
-
17) Are emergency exit signs and route adequate?
-
Comments:
-
Attach any images relevant to question 17 here.
-
18) Has a fire drill been carried out?<br>(Every six months)
-
Comments:
-
Attach any images relevant to question 18 here.
-
19) Is the standard of cleanliness acceptable?<br>(Rubbish removed)
-
Comments:
-
Attach any images relevant to question 19 here.
-
20) Are all statutory notices displayed and in date?<br>(HASWA poster, F10, Employers Liability, H&S Policy, Emergency Plan)
-
Comments:
-
Attach any images relevant to question 20 here.
-
21) Have any arrangements been made for those who do not have English as a first language or of limited reading ability?
-
Comments:
-
Attach any images relevant to question 21 here.
-
22) Do doors along walkways have vision panels to prevent collisions?
-
Comments:
-
Attach any images relevant to question 22 here.
-
23) is adequate lighting, ventilation temperature control available?
-
Comments:
-
Attach any images relevant to question 23 here.
-
24) Have Display Screen Assessments been carried out?
-
Comments:
-
Attach any images relevant to question 24 here.
-
25) Are pedestrians and vehicles adequately segregated?
-
Comments:
-
Attach any images relevant to question 25 here.
-
26) How are maintenance issues addressed?<br>e.g. light bulbs, fuse boards
-
Comments:
-
Attach any images relevant to question 26 here.
-
27) Are all staff made aware of the security arrangements / locking up procedures?
-
Comments:
-
Attach any images relevant to question 27 here.
Stores
-
28) Is a record of PPE issue kept?
-
Comments:
-
Attach any images relevant to question 28 here.
-
29) Are those who use hazardous substances informed as to the hazards?
-
Comments:
-
Attach any images relevant to question 29 here.
-
30) Is the storage of hazardous substances satisfactory?
-
Comments:
-
Attach any images relevant to question 30 here.
-
31) Is the storage of cylinders satisfactory?<br>(ventilated, segregated, hard level standing, roof, signs, locked, quantities)
-
Comments:
-
Attach any images relevant to question 9 here.
-
32) is the storage of lifting accessories adequate? (segregation of quarantined items)
-
Comments:
-
Attach any images relevant to question 32 here.
-
33) is the loading bay adequately guarded to prevent falls from height?
-
Comments:
-
Attach any images relevant to question 33 here.
-
34) is there adequate access / egress?
-
Comments:
-
Attach any images relevant to question 34 here.
-
35) Is there adequate firefighting provision and emergency escape?
-
Comments:
-
Attach any images relevant to question 35 here.
-
36) Are items stored safely with easy access to them?
-
Comments:
-
Attach any images relevant to question 36 here.
Sign Off Audit
-
Print Name:
-
Signature:
-
Project Manager Name:
-
Signature:
-
Designation:
-
Select date