Information
-
Document No.
-
Audit Title
-
Client / Site (displayed on first page)
-
Conducted on
-
Prepared by
More than one auditor?
-
Additional auditors
-
Managers, Supervisors and employees are familiar with the requirments of the Construction Environmental Management Plan.
-
Noise mitigation and attenuation measures in place for plant and equipment to limit construction noise (EMP PDS 2)
-
Dust prevention is identified as a priority within pre-start meetings, JSEA's and task planning (EMP PDS 4)
-
Measures are in place for effective dust management and suppression (EMP PDS 4)
-
Dust is being monitored and data used to inform site management and activities (EMP PDS 5)
-
Effective waste management maintained (segregation of waste, bins emptied, recycling facilities etc) (EMP PDS 6)
-
Chemicals are stored correctly with MSDS and MSDS register in place (EMP PDS 9)
-
Bunds are in place for mechanical equipment (fuel-powered) such as generators, pumps and fuel trailers (EMP PDS 9)
-
Oil spill response kits stocked and located in appropriate areas and staff trained in their use (EMP PDS 10)
-
Employees/Supervisors aware of process to be followed if a potential heritage or Aboriginal site identified (EMP PDS 11)
-
Stormwater / Groundwater Management Plan is being followed and measures in place to contain and manage discharges (EMP PDS 12)
-
Decommissioned landfill site delineated on site plans. No trenching of the pre-existing capping layer in this area. (EMP PDS 13)
-
Procedures in place to manage bulk earthworks and acceptance and relocation of soil throughout site. (EMP PDS 14)
-
Inert waste streams are being segregated and appropriately managed (EMP PDS 14)
-
Odorous/stained soils have been stockpiled, labelled, bunded and appropriate testing and management has been in accordance with the Soil Management Plan. (EMP PDS 14)
-
Where a noise, dust or general community complaint has been made, the PCP Communications Team have been contacted to handle the complaint.
Action required?
-
Action
-
Allocated to
-
Action due
-
Signed PoMC Representative:
-
Signed Principal Contractor Representative (optional):