Title Page
-
Conducted on
-
Prepared by
-
Location
-
Personnel
Pre Start
-
Take 5 filled out
C.S.E
-
Confirmed and spoke to correct contact before arrival
-
Confirmed service with correct contact on completion
ETA
-
Real Time milestones met<br>
-
Sign off text correct
-
Correct code claimed
Testing
-
Use of Tech Tester / NTS prior to arrival<br>
-
Use of tech tester/NTS at completion of job
-
Correct hand held test instruments used
-
Is technician able to explain test results
-
First test point and why
-
second and subsequent test points and why
Repair
-
Minex of test point carried out
-
Fault Apparent
-
Add media
-
All tools and materials at hand
Skills witnessed
-
Press response to bring up drop down list
- CSE
- Tech Tester/NTS
- Jumpering
- Access Point minex
- BDD pit
- Aerial service leads
- U/G service leads
- Cable locating
- Plan reading
- Excavation
- Jointing
- Heat Shrink closure
- Re-instatement
- Paperwork e.g CNA PDR etc
-
Follow up required