Title Page

  • Conducted on

  • Prepared by

  • Viscore ID

  • Is the job over or under $50k?

  • Address:

  • CSA

  • Contractor/Tech

Handover & Collateral Delivered to Chorus

1.000 Design

  • 1.008 - Standards: Power & Building work within capacity & loading of infrastructure

  • Comments: Please refer to the relevant task code for any comments

2.000 Handover & Collateral Delivered to Chorus

  • 2.004 - Compliance Certificates: Compliance certificates available (RMA, PTW, Electrical)

  • 2.015 - Records Integrity: OTDR traces (all cable fibres @ 1310 & 1550nm wavelength) confirmed delivered to Chorus

  • 2.019 - NCSP: All network items defined within the Chorus Network Specified Product (CNSP) process are used in the network. No non approved items used

  • Comments: Please refer to the relevant task code for any comments

6.000 Work Areas & Safety

  • 6.002 - Hazards: Hazards identified & recorded - Worksite audit form completed / Hazard Notices in place

  • 6.006 - Confined Space: Gas Detector - within current calibration certificate

  • 6.008 - Network: Network security correct (Exchange)

  • 6.012 - Temporary work: clearly labelled and contains name, contact details, job ID of person involved.

  • 6.014 - Referrals: Any defects to existing network outside of scope of project referred to be rectified in the future

  • 6.016 - H&S: Correct H&S practices observed

  • Comments: Please refer to the relevant task code for any comments

7.000 Exchange Equipment

  • 7.001 -Equipment: Equipment positioned & installed correctly, ventilation unimpeded and compliant with seismic needs, correct earthing present, fastenings, isolations, masking, covers correct. Correctly labelled. Correct earthing present and secure (in particular earth lugs).

  • 7.007 - MDF: MDF components secure, labelled, jumper management correct

  • 7.010 - Cable Tray: Cable type & size and labelled OK. Installation neat and tidy. Cable tray earthing & isolation correct

  • 7.011 - Cable Terminations: Cable and jumper terminations tidy & to required standard

  • 7.012 - Cable Run: UTP & structures cables are supported and routed securely. not tight bends, Velcro ties used

  • 7.014 - Fuse: Circuit breakers / fuses correct type & size & labelled

  • 7.017 - Fibre: Trunking manages fibre cords within maximum capacity limits; drop off position OK, flexitube anchored at equip, fibre slack managed

  • 7.018 - Fibre & Smoke Barriers: Fire & Smoke stopping around wall cable access holes

  • 7.025 - Equipment: GPON GR3 rack: Fibre cords on RHS, electrical on LHS. electrically isolated and earthed. Footprint labelled correctly, left clean and tidy.

  • Comments: Please refer to the relevant task code for any comments

9.000 MDF

  • 9.002 - MDF: MDF Block Labelling correct (Cable Number, Pair range)

  • 9.003 - MDF: MDF Area cable entry duct sealed

  • 9.007 - MDF: IDC jumper terminations correct (full insertion to IDC, excess trimmed)

  • 9.009 - MDF: Old jumpers removed

  • 9.010 - Protection: Lightning protection (where fitted) earth to common earth

  • Comments: Please refer to the relevant task code for any comments

11.000 OFDF & Exchange Fibre:

  • 11.001 - Fibre: All optical cables 100% support on horizontal & managed on vertical, no more than 400mm fibre cable to be unsupported. Single Fibre Organiser tray not overfilled. Labelled correctly

  • 11.002 - OFDF: OFDF hardware secure: OFDF Drawer-Cable Trough-Guides-Rack

  • 11.003 - Records Integrity: Network labelling correct at AOFDF and datacard completed

  • 11.007 - Fibre: 30mm bending radius unconditionally observed at all locations

  • 11.009 - Fibre: Trunking manages fibre cords within maximum capacity limits; drop off position OK, flexitube anchored at equip

  • 11.010 - H&S: Protective caps on all unterminated connectors

  • 11.011 - H&S: Connectors cleaned and verified with Fibre Inspection Probe

  • 11.012 - H&S: Laser Safety labels (1M Safety) at OFDF (inside and front panel)

  • 11.013 - H&S: No fibre task waste, all optical (glass) ends safely contained

  • 11.014 Access OFDF: Access OFDF patchcords routed within mandrels. Excess length stored at AOFDF end

  • 11.018 - Access OFDF: Access OFDF rack (GR3): Cables secured, breakout to OFDF shelves tidy .Patch cords on the POLT are installed and labelled

  • Comments: Please refer to the relevant task code for any comments

50.000 Exchange Complex Services

  • 50.001 - Equipment: Card installed & configured

  • 50.002 - Equipment: Levels adjusted to suit configuration & labelled

  • 50.004 - Security: Equipment covers secure

  • 50.003 - Security: Alarms checked and correct

  • Comments: Please refer to the relevant task code for any comments

14.000 Cable Removal

  • 14.001 - Cable Removal: Correct cables recovered

  • 14.002 - Cable Removal: Withdrawing method correct

  • 14.004 - Earthing: Exchange earthing still intact (old lead sheaths used as earth mat)

  • 14.005 - Joint: Fibre and copper enclosures and termination blocks removed

  • 14.006 - Equipment: Distribution cabinets, shelves, fasteners and earths removed. Penetrations made good

  • 14.007 - Damage: Remaining Cables not damaged. Sheaths not rubbed, cable pair insulation intact.

  • Comments: Please refer to the relevant task code for any comments

The templates available in our Public Library have been created by our customers and employees to help get you started using SafetyCulture's solutions. The templates are intended to be used as hypothetical examples only and should not be used as a substitute for professional advice. You should seek your own professional advice to determine if the use of a template is permissible in your workplace or jurisdiction. You should independently determine whether the template is suitable for your circumstances.