Title Page
-
Conducted on
-
Prepared by
-
Viscore ID
-
Is the job over or under $50k?
-
Address:
-
CSA
-
Contractor/Tech
Handover & Collateral Delivered to Chorus
1.000 Design
-
1.008 - Standards: Power & Building work within capacity & loading of infrastructure
-
Comments: Please refer to the relevant task code for any comments
2.000 Handover & Collateral Delivered to Chorus
-
2.004 - Compliance Certificates: Compliance certificates available (RMA, PTW, Electrical)
-
2.015 - Records Integrity: OTDR traces (all cable fibres @ 1310 & 1550nm wavelength) confirmed delivered to Chorus
-
2.019 - NCSP: All network items defined within the Chorus Network Specified Product (CNSP) process are used in the network. No non approved items used
-
Comments: Please refer to the relevant task code for any comments
6.000 Work Areas & Safety
-
6.002 - Hazards: Hazards identified & recorded - Worksite audit form completed / Hazard Notices in place
-
6.006 - Confined Space: Gas Detector - within current calibration certificate
-
6.008 - Network: Network security correct (Exchange)
-
6.012 - Temporary work: clearly labelled and contains name, contact details, job ID of person involved.
-
6.014 - Referrals: Any defects to existing network outside of scope of project referred to be rectified in the future
-
6.016 - H&S: Correct H&S practices observed
-
Comments: Please refer to the relevant task code for any comments
7.000 Exchange Equipment
-
7.001 -Equipment: Equipment positioned & installed correctly, ventilation unimpeded and compliant with seismic needs, correct earthing present, fastenings, isolations, masking, covers correct. Correctly labelled. Correct earthing present and secure (in particular earth lugs).
-
7.007 - MDF: MDF components secure, labelled, jumper management correct
-
7.010 - Cable Tray: Cable type & size and labelled OK. Installation neat and tidy. Cable tray earthing & isolation correct
-
7.011 - Cable Terminations: Cable and jumper terminations tidy & to required standard
-
7.012 - Cable Run: UTP & structures cables are supported and routed securely. not tight bends, Velcro ties used
-
7.014 - Fuse: Circuit breakers / fuses correct type & size & labelled
-
7.017 - Fibre: Trunking manages fibre cords within maximum capacity limits; drop off position OK, flexitube anchored at equip, fibre slack managed
-
7.018 - Fibre & Smoke Barriers: Fire & Smoke stopping around wall cable access holes
-
7.025 - Equipment: GPON GR3 rack: Fibre cords on RHS, electrical on LHS. electrically isolated and earthed. Footprint labelled correctly, left clean and tidy.
-
Comments: Please refer to the relevant task code for any comments
9.000 MDF
-
9.002 - MDF: MDF Block Labelling correct (Cable Number, Pair range)
-
9.003 - MDF: MDF Area cable entry duct sealed
-
9.007 - MDF: IDC jumper terminations correct (full insertion to IDC, excess trimmed)
-
9.009 - MDF: Old jumpers removed
-
9.010 - Protection: Lightning protection (where fitted) earth to common earth
-
Comments: Please refer to the relevant task code for any comments
11.000 OFDF & Exchange Fibre:
-
11.001 - Fibre: All optical cables 100% support on horizontal & managed on vertical, no more than 400mm fibre cable to be unsupported. Single Fibre Organiser tray not overfilled. Labelled correctly
-
11.002 - OFDF: OFDF hardware secure: OFDF Drawer-Cable Trough-Guides-Rack
-
11.003 - Records Integrity: Network labelling correct at AOFDF and datacard completed
-
11.007 - Fibre: 30mm bending radius unconditionally observed at all locations
-
11.009 - Fibre: Trunking manages fibre cords within maximum capacity limits; drop off position OK, flexitube anchored at equip
-
11.010 - H&S: Protective caps on all unterminated connectors
-
11.011 - H&S: Connectors cleaned and verified with Fibre Inspection Probe
-
11.012 - H&S: Laser Safety labels (1M Safety) at OFDF (inside and front panel)
-
11.013 - H&S: No fibre task waste, all optical (glass) ends safely contained
-
11.014 Access OFDF: Access OFDF patchcords routed within mandrels. Excess length stored at AOFDF end
-
11.018 - Access OFDF: Access OFDF rack (GR3): Cables secured, breakout to OFDF shelves tidy .Patch cords on the POLT are installed and labelled
-
Comments: Please refer to the relevant task code for any comments
50.000 Exchange Complex Services
-
50.001 - Equipment: Card installed & configured
-
50.002 - Equipment: Levels adjusted to suit configuration & labelled
-
50.004 - Security: Equipment covers secure
-
50.003 - Security: Alarms checked and correct
-
Comments: Please refer to the relevant task code for any comments
14.000 Cable Removal
-
14.001 - Cable Removal: Correct cables recovered
-
14.002 - Cable Removal: Withdrawing method correct
-
14.004 - Earthing: Exchange earthing still intact (old lead sheaths used as earth mat)
-
14.005 - Joint: Fibre and copper enclosures and termination blocks removed
-
14.006 - Equipment: Distribution cabinets, shelves, fasteners and earths removed. Penetrations made good
-
14.007 - Damage: Remaining Cables not damaged. Sheaths not rubbed, cable pair insulation intact.
-
Comments: Please refer to the relevant task code for any comments