Title Page
-
Conducted on
-
Conducted by
-
Location
Operatives
-
Names of operatives on-site
-
Registration of vehicle on-site
Procedures and documentation
-
Have the vehicle Pre-drive checks been carried out today?
-
Have harness inspections been completed today?
-
Have Rams been Received by the lead scaffolder?
-
Has the compliance sheet been received by the lead scaffolder?
-
Has the lead scaffolder carried out the on-site risk assessment on I-auditor.
PPE Requirements
-
Are all operatives on-site wearing the correct PPE?
-
Are the hard hat being worn correctly with the chin strap attached?
-
Are the harness's being worn correctly?
-
Are all operatives wearing steel toe cap boots?
-
Are all operatives wearing Gloves?
-
Do the operatives have a Scaffold step on-site?
TG20/Design
-
Is the scaffold being constructed to the TG20 Compliance sheet provided?
-
Is the scaffold being constructed to the design provided?
-
If not highlight to the operatives of your findings and explain to them what is missing from the scaffold that can be installed before completion of the scaffold.
SG4
-
Has/is the scaffold been constructed in a manner to comply with SG4:22?
-
Are the operatives using the scaff step to install the advanced guardrail?
Non-Conformance
-
Have you highlighted any non-conformances during the audit
-
Any non-conformances highlighted during the audit will need discussing with the operatives on-site on the findings and explianed where they can improve to avoid any non-non-conformaces in future audits.
Positive observations
-
Is there any positive observations highlight during the audit.
-
If positives observations have been highlighted during the audit, the positive observation will need relaying to the operatives on-site to show positive observations are also being noted and the audit isn't just about negativity.
-
Overall review
-
Are you satisfied with the manner in which the works are being carried out.