1.0 - Previous Inspection
-
1.1 - Has the last inspection been reviewed?
-
1.2 - Are there any outstanding actions?
2.0 - General Matter
-
2.1 - Are the unnecessary things removed?
-
2.2 - Are the frequently used tools / equipments well arranged?
-
2.3 - Is the floor cleaned regularly and free from oil?
-
2.4 - Is there enough lighting in the station?
-
2.5 - Make sure that the emergency switch and switch board are turn off before maintenance.
-
2.6 - Make sure that the fuse is switch off before maintenance.
-
2.7 - Make sure that the signboard "Caution, maintenance work is in progress“ is place on the switch board before maintenance begins.
-
2.8 - Are the PPE used during working?
-
2.9 - Make sure that there is no one near the machines during operation start-up.
-
2.10 - Does the worker used earplugs while working in the kernel plant?
-
2.11 - Are the warning signs placed at the right location?
-
2.12 - Make sure that there is a pallet covered with rubber underneath the front switch board.
-
2.13 - Make sure that the switch board is in dry condition (not wet).
-
2.14 - Make sure that there is no exposed cable wire.
-
2.15 - Make sure that there is no unsafe act / condition.
3.0 - Tank (Hot Water Tank)
-
3.1 - Are the drains / floor cleaned and free from mud?
-
3.2 - Are the manholes closed during operation?
-
3.3 - Does the worker understands the works in a confined space?
-
3.4 - Is there any warning sign of "Beware of slippery floor" being put up?
-
3.5 - Is there any warning sign of "Caution, confined space" being put up?
-
3.6 - Make sure that the tank is labelled.
-
3.7 - Make sure that there is no unsafe act / condition.
4.0 - Boiler
-
4.1 - Make sure that there is no exposed cable wire.
-
4.2 - Make sure that the switch board is in dry condition (not wet).
-
4.3 - Are the manholes closed during operation?
-
4.4 - Is the steam line pipe covered with insulator?
-
4.5 - Make sure that the boiler is labelled.
-
4.6 - Is there any warning sign of "Caution, confined space" being put up for the furnace, steam drum and mud drum?
-
4.7 - Is there any warning sign being put up at the blow down chamber area?
-
4.8 - Is there any warning sign being put up at the dust collector area?
-
4.9 - Does the worker wears face mask while working at the racking furnace?
-
4.10 - Is there any negative draft during the racking furnace?
-
4.11 - Are the long racking tools in a good condition?
-
4.12 - Is the ashes dampened at the soot conveyor?
-
4.13 - Make sure that there is no unsafe act / condition.
5.0 - Fan & Airlock (ID Fan, FD Fan, Secondary Fan, FF Fan, Dust Bunker Airlock)
-
5.1 - Make sure that there is no exposed wire.
-
5.2 - Make sure that there is a machine guide for belting.
-
5.3 - Make sure that the fan and airlock are labelled.
-
5.4 - Make sure that the emergency switch for the fan and airlock is labelled.
-
5.5 - Make sure that there is no unsafe act / condition.
6.0 - Elevator (NA)
-
6.1 - Are the stairs and platforms cleaned regularly and free of oil?
-
6.2 - Make sure that there is no exposed cable wire.
-
6.3 - Make sure that there is a machine guide for transmission chain or coupling.
-
6.4 - Make sure that there is a closed cover for the elevator.
-
6.5 - Make sure that the elevator is labelled.
-
6.6 - Make sure that the emergency switch for the elevator is labelled.
-
6.7 - Make sure that the hand rails and pathways are free from thick dust.
-
6.8 - Is the floor cleaned regularly and free from kernel?
-
6.9 - Make sure that the spillage is disposed off or recycled back immediately.
-
6.10 - Make sure that there is no unsafe act / condition.
7.0 - Softener
-
7.1 - Is there any warning sign of "Caution, confined space" being put up at the softener?
-
7.2 - Make sure that the softener is labelled.
-
7.3 - Is the floor cleaned regularly and in dry condition?
-
7.4 - Make sure that there is no unsafe act / condition.
8.0 - Ribbon Conveyor( Soot CV, Fiber and Shell Conveyor)
-
8.1 - Are the stairs cleaned regularly and free from kernel?
-
8.2 - Make sure that there is no exposed wire.
-
8.3 - Make sure that there is a machine guide for transmission chain or coupling.
-
8.4 - Make sure that there is a closed cover for the Ribbon conveyor.
-
8.5 - Make sure that the motor is not in an oily or wet condition.
-
8.6 - Make sure that the Ribbon conveyor is labelled.
-
8.7 - Make sure that the emergency switch for the Ribbon conveyor is labelled.
-
8.8 - Is the floor cleaned regularly and free from kernel?
-
8.9 - Make sure that any spillage is disposed off or recycled back immediately.
-
8.10 - Make sure that there is no unsafe act / condition.
9.0 - Pump (Boiler Feed Pump, Chemical Dosing Pump)
-
9.1 - Is the belting guide placed on the pump?
-
9.2 - Make sure that there is no exposed wire.
-
9.3 - Make sure that the motor is not in a wet condition.
-
9.4 - Make sure that the motor's cover is placed securely and properly.
-
9.5 - Make sure that the pump is labelled.
-
9.6 - Make sure that the emergency switch for the pump is labelled.
-
9.7 - Is the rubber hose for the dosing pump placed neatly?
-
9.8 - Is there a cover for the chemical dosing tank?
-
9.9 - Make sure that there is no unsafe act / condition.
10.0 - Scrapper Bar Conveyor (Boiler Feed Conveyor)
-
10.1 - Are the stairs and platforms cleaned regularly?
-
10.2 - Make sure that there is no exposed cable wire.
-
10.3 - Make sure that there is a machine guide for transmission chain.
-
10.4 - Make sure that there is a closed cover for the scrapper bar conveyor.
-
10.5 - Make sure that the scrapper bar conveyor is labelled.
-
10.6 - Make sure that the emergency switch for the scrapper bar conveyor is labelled.
-
10.7 - Make sure that there is no unsafe act / condition.
11.0 - Daerator
-
11.1 - Is there any warning sign of "Caution, confined space" being put up at the daerator?
-
11.2 - Is the platform / walkway / handrail in good condition?
-
11.3 - Is the workplace cleaned?
-
11.4 - Make sure that there is no unsafe act / condition.