Information
-
Audit Title
-
Client / Site
-
Conducted on
-
Prepared by
-
Location
-
Personnel
1.0 - Previous Inspection
-
1.1 - Has the last inspection been reviewed?
-
1.2 - Are there any outstanding actions?
2.0 - General Matter
-
2.1 - Are the unnecessary things removed?
-
2.2 - Are the frequently used tools / equipments well arranged?
-
2.3 - Are the floor / platforms / stairs cleaned regularly and free from oil?
-
2.4 - Is there enough lighting in the station?
-
2.5 - Make sure that the emergency switch and switch board are turn off before maintenance.
-
2.6 - Make sure that the fuse is switch off before maintenance.
-
2.7 - Make sure that the signboard "Caution, maintenance work is in progress“ is place on the switch board before maintenance begins.
-
2.8 - Are the PPE used during working?
-
2.9 - Make sure that there is no one near the machines during operation start-up.
-
2.10 - Are the warning signs placed at the right location?
-
2.11 - Make sure that there is a pallet covered with rubber underneath the front switch board.
-
2.12 - Make sure that the switch board is in dry condition (not wet).
-
2.13 - Is the light fitting in good condition?
-
2.14 - Make sure that there is no unsafe act / condition.
3.0 - Digester
-
3.1 - Make sure that there is no leakage on the steam pipe.
-
3.2 - Is the steam pipe insulated with insulator such as rock wool or asbestos rope of six feets high?
-
3.3 - Make sure that there is a machine guide for belting.
-
3.4 - Make sure that there is no exposed cable wire.
-
3.5 - Make sure that the manholes for the digester is closed during operation start-up.
-
3.6 - Make sure that the spillage is disposed off or recycled back immediately.
-
3.7 - Make sure that there is no unsafe act / condition.
4.0 - Press
-
4.1 - Make sure that there is a machine guide for belting.
-
4.2 - Make sure that there is no leakage on the press
-
4.3 - Make sure that the handrail is free from oil.
-
4.4 - Make sure that there is no exposed cable wire.
-
4.5 - Make sure that the spillage is disposed off or recycled back immediately.
-
4.6 - Make sure that there is no unsafe act / condition.
5.0 - Fan & Airlock
-
5.1 - Make sure that there is a machine guide for coupling.
-
5.2 - Make sure that there is no exposed cable wire.
-
5.3 - Make sure that the hand rail is free from thick dust.
-
5.4 - Make sure that the fan & airlock is labelled.
-
5.5 - Make sure that the emergency switch for the fan & airlock is labelled.
-
5.6 - Make sure that the spillage is disposed off or recycled back immediately.
-
5.7 - Make sure that there is no unsafe act / condition.
6.0 - Elevator (Nut Elevator)
-
6.1 - Are the stairs cleaned regularly and free from oil?
-
6.2 - Make sure that there is no exposed cable wire.
-
6.3 - Make sure that there is no one near the elevator during operation start-up.
-
6.4 - Make sure that there is a machine guide for transmission chain or coupling.
-
6.5 - Make sure that there is a closed cover for the elevator.
-
6.6 - Make sure that the motor is not in a dusty condition.
-
6.7 - Make sure that the elevator is labelled.
-
6.8 - Make sure that the spillage is disposed off or recycled back immediately.
-
6.9 - Make sure that there is no unsafe act / condition.
7.0 - Drum (Nut Polishing Drum)
-
7.1 - Are the stairs cleaned regularly and free from oil?
-
7.2 - Make sure that there is no exposed wire cable.
-
7.3 - Make sure that there is a machine guide for transmission chain.
-
7.4 - Make sure that the nut polishing is labelled.
-
7.5 - Make sure that there is no one near the polishing drum during operation start-up.
-
7.6 - Make sure that the spillage is disposed off or recycled back immediately.
-
7.7 - Make sure that there is no unsafe act / condition.
8.0 - Ribbon Conveyor (Top Cross CV, Digester Feed CV, Cake Breaker CV, Nut CV)
-
8.1 - Are the stairs cleaned regularly and free from oil?
-
8.2 - Make sure that there is no exposed wire.
-
8.3 - Make sure that there is a machine guide for coupling.
-
8.4 - Make sure that the motor is not in an oily or wet condition.
-
8.5 - Make sure that there is a closed cover for the Ribbon conveyor.
-
8.6 - Make sure that the Ribbon conveyor is labelled.
-
8.7 - Make sure that the emergency switch for the Ribbon conveyor is labelled.
-
8.8 - Make sure that there is no one near the Ribbon conveyor during operation start-up.
-
8.9 - Make sure that the hand rails are free from oil.
-
8.10 - Make sure that any spillage is disposed off or recycled back immediately.
-
8.11 - Make sure that there is no unsafe act / condition.
Sign Off
-
On site representative
-
Auditor's signature