Pre-Construction
Construction
-
Is the excavation free of water?
-
Is the groundwater being managed in accordance with CWW's procedure? (PRO-36)
-
Is discharge water being filtered prior to entry into storm water system or waterway?
-
Has the contractor buffered surrounding areas from the effects of discharge water to prevent erosion, flooding or scouring of land?
-
Have silt traps or other control measures been deployed on all drainage lines prior to commencement of works?
-
Have silt fences been correctly installed on downslopes and embankments in proximity to waterways and are they adequate?
-
Are silt traps and silt fences being maintained and inspected during construction works?
-
Are all stockpiles and other material from excavations located at least 10 metres from waterways?
-
Do stockpiles have controls to prevent runoff carrying eroded material?
-
Are contaminated stockpiles managed in accordance with EMP requirements?
-
Are drains, channels and gutters being kept clear?
-
Is the site of the works free of litter and rubbish?
-
Is the contractor employing tarpaulin covering on trucks when carting soil off site?
-
Is there a stabilized access point allowing entry to and exit from the site?
-
Is the contractor adhering to the exclusion ('no go') zones identified for native vegetation and/or cultural heritage sensitivity?
-
Is the noise level at or below general the level required for normal construction activities?
-
Are the works in a known PASS and ASS (Acid Sulfate Soils) area and are the controls in place on site?
Post-Construction
-
Have silt fences been left in position to assist with site reinstatement?
-
Has the contractor completed the site reinstatement for seeding, replanting and landscaping?