1. Completed By Trade Contractor.
-
Detail of work to be carried out,
-
Area of site undergoing excavation, reduced level digging or penetration are described by map or drawing to be attached.
Precautions to be taken to avoid danger & damage to buried services such as Radar/CAT/Acoustic Wall Device:
-
CAT Scan Carried out:
-
Confirmation that the area to be disturbed has been surveyed. The coordinated drawing is up to date.
-
Are services marked up and do all understand the markings in relation to services ?
-
Has the CAT & GENNY and used in locating services ?
-
Confirm that the operators / Banksman and machine driver have been briefed on services and precautions.
-
ALL operators are aware that they should not deviate from the Method Statement. If services encountered during the works are different ( e.g. Type, location etc ) to those already identified they MUST stop work and consult the supervisor and services coordinator.
-
If using power tools or machinery within 500mm either side of the line of known buried services is unavoidable. Detail the additional control measures to be taken below:
-
Extra detailed control measures if needed:
-
Confirm that the service(s) (National Grid, BT etc) emergency contact details are known for immediate communications.
Trade Contractor Supervisor Confirmation:
-
Confirmation that the above items have been discussed with all those concerned and agreed with the information supplied.
Driver Confirmation:
-
I have discussed and agree with all items above.
Banksman Confirmation:
-
I have discussed and agree with all items above.
2. Services Co-ordinator Confirmation:
-
I have discussed and agree with all the items above. All operatives understand the precautions to be taken with the works:
3. Permit Closed Out:
-
All excavation(s) have been left in a safe and secure manner with appropriate barriers to prevent falls. Signage must be in place. If excavation has been back-filled, that it has the correct identification markings for services and is added to the drawings.
-
Photos taken to show exposed services:
-
Photos taken to show installed marked services:
-
All information is added to as built drawing:
-
Wates BSC name:
-