Title Page
-
Site conducted
-
Conducted on
-
Prepared by
-
Location
Risk Assessment
-
To complete this permit to work you must:
-
1. Identify the hazard present on the job and the action to be taken to remove or reduce the risk of injury
-
2. Use the site specific hazards listed below
-
Note: Take into account any person who may be affected by hazards associated with the work
Work Details
-
Company name and staff
-
Contact name and number
-
Description of work
-
Photos of work site
Persons at risk
-
Who could be harmed by the work - please select all applicable people
- Contractor
- Maintenance Staff Member
- Factory Staff Member
- Onlooker
Hazard Identification
-
A action must be taken if a hazard is present. If the residual risk is still high after the action is completed you must not proceed with the work
-
Slips, trips or falls
-
Action taken to reduce the risk
-
Residual risk remaining after action
-
Falls from height or roof work
-
You must obtain an additional permit for this type of work
-
Action taken to reduce the risk
-
Residual risk remaining after action
-
Falling objects
-
Action taken to reduce the risk
-
Residual risk remaining after action
-
Chemicals
-
Action taken to reduce the risk
-
Residual risk remaining after action
-
Heat/fire/Hot Work
-
An additional permit is required for this work
-
Action taken to reduce the risk
-
Risidual risk remaining after action
-
Asphyxiation
-
Action taken to reduce the risk
-
Residual risk remaining after action
-
Asbestos
-
Please refer to the Asbestos Management Plan before proceedign with any work
-
Action taken to reduce the risk
-
Residual risk remaining after action
-
Overturn/Collapse
-
Action taken to reduce the risk
-
Residual risk remaining after action
-
Manual Handling
-
Action taken to reduce the risk
-
Residual risk remaining after action
-
-
Mobile Equipment
-
Action taken to reduce the risk
-
Residual risk remaining after action
-
Confined Space
-
An additional permit is required for this type of work
-
Action taken to reduce the risk
-
Residual risk remaining after action
-
Dust and/or fumes
-
Action taken to reduce the risk
-
Residual risk remaining after action
-
Noise
-
Action taken to reduce the risk
-
Residual risk remaining after action
-
Electricity
-
Action taken to reduce the risk
-
Residual risk remaining after action
-
Contamination
-
Action taken to reduce the risk
-
Residual risk after action
-
Poor Lighting
-
Action taken to reduce the risk
-
Residual risk remaining after action
-
Temperature
-
Action taken to reduce the risk
-
Residual risk remaining after action
-
Adverse weather
-
Action taken to reduce the risk
-
Residual risk remaining after action
-
Uncertified equipment
-
Action taken to reduce the risk
-
Residual risk remaining after action
-
Pressure/Gases
-
An additional permit is required for this type of work
-
Action taken to reduce the risk
-
Residual risk remaining after action
undefined
Additional Notes
-
Enter ny additional information
This is a record of the Site Specific Risk Assessment conducted for teh above work
-
Name
-
Signature
-
Date
Continuation, if this assessment continues for more than one day and the conditions have not changed, Sign and Date
-
Signature
-
Date
-
Signature
-
Date
-
Signature
-
Date