Pillar Drill Maintenance Checklist
-
Visual checks on X/Y/Z Axis, is there free movement full way across/along the mill bed.
-
Operate electronic feed for X axis along the mill bed. Operate the machine at various speeds are there any issues.
-
Turn on mill head, increase and decrease chuck speed (RPM) and listen for any unusual sounds, are there any abnormalities.
-
Rotate mill head 90 degrees using manual drive both ways, does it rotate smoothly and locks into place
-
Remove old coolant from tray via drain holes underneath swarf tray, is the tray clean and clear
-
Remove pump from the rear entrance to the coolant tray and clean down, are there any faults or issues
-
Fill up coolant tray with 20% coolant and 80% water. Then place the pump back into the tray.
-
Give pump run through and check new coolant is flowing through, replace hose if clogged.
-
Check all limits work for every axis when fully driven both ways and test emergency stop button.
-
Wipe down machine using contact cleaner, clear out all swarf from mill bed and collection tray underneath.
-
Put all tools and chemicals (coolant, cleaner) used back into their respective locations
-
Fill out and sign off risk assessment and upload *this* report and RA to BAB Activ.