Title Page

  • Site conducted

  • Conducted on

  • Prepared by

  • Location

Pre-Inspection

  • Did you check hydraulic oil level, and is it satisfactory?

  • Did you check all cables for cuts, frays or holes in the insulation, and is it satisfactory?

  • Did you check all hoses for leaks and is it satisfactory?

  • Did you check all functions of the remote and the boom before concrete arrives, and is it satisfactory?

  • Did you check all clamps are pinned and secure, and is it satisfactory?

  • Prior to extending the boom, did you ensure that any attachments (such as reducers, folding pipes, etc.) have been secured with a safety device or tether?

  • Did you check that the air compressor works for blow back and is it satisfactory?

  • Did you check for pipe blockage by means of sponge or bullet before concrete?

Post-Inspection

  • Did you make sure blow out cap is stored away and is it satisfactory?

  • Did you make sure remote is stored properly and is it satisfactory?

  • Did you check for hydraulic leaks and is it satisfactory?

  • Did you check for leaks with gaskets and is it satisfactory?

  • Did you check with your supervisor prior to leaving the jobsite?

  • Has the boom been greased at least once this week?

The templates available in our Public Library have been created by our customers and employees to help get you started using SafetyCulture's solutions. The templates are intended to be used as hypothetical examples only and should not be used as a substitute for professional advice. You should seek your own professional advice to determine if the use of a template is permissible in your workplace or jurisdiction. You should independently determine whether the template is suitable for your circumstances.