Information
-
Job Number
-
Customer Surname
-
Engineer Tech Number
-
Conducted on
-
Completed by
-
Location
ETA
-
Was the customer given a ETA via phone the day before ?
-
Did the customer speak to the engineer or have a message left about there visit ?
-
Did the customer receive a text message with there ETA ?
-
Was there any issues with the customers ETA ?
Introductions
-
Did the engineer introduce himself / herself and show there ID badge ?
-
Did the engineer confirm all the job details before starting any work ?
-
Did the engineer wear over shoes when entering the house / Flat ?
-
Did engineer go over all the work he/she was about to carry out ?
Install details
-
What was the signal strength on the STB ?
-
Was the latest software downloaded on to all STB's ?
Cabling
-
Was all phone lines run to a acceptable standard ?
-
Is all twin cable run correctly ?
Health and safety
-
Is a eyebolt hole present ?
-
What section ladder was used ?
Damage awareness
-
Was all holes sealed with blast plates ?
-
Was all rubbish removed by engineer ?
Customer satisfaction
-
Was customer happy with what work the engineer carried out ?
-
Did the customer sign the MFT device?<br>
-
Did the customer receive a seg 30 booklet and contact number ?
Comments
Photos of install / Service
-
Add media
TM Signature
-
Add signature