Title Page
-
Document No.
-
Conducted on
-
Prepared by
-
Location
-
Date
-
Customer's full name:
-
Field Aware Job ID:
-
Customer Address
-
Issues identified
- High maximum demand - customer needs to manage load by e.g. only charging at night / not having all appliances on at the same time
- Bonding not present
- Maximum demand too high
- Faulty DNO equipment
- Incorrect unit ordered
- Customer requests a different cable length
- Garage feed is not sufficient
- Main earth or Ze is not sufficient or within limits
- Main fuse needs uprating
- Existing install is unsafe
- No space in DNO or for any consumer units
- Customer not in and not responding to attempts to contact
-
Description of issue(s)
-
Next steps...
-
Can install proceed at this time?
-
Customer's signature:
-
Add signature
-
Installer's name and signature:
-
Add signature