Title Page
-
Site conducted
-
Conducted on
-
Performed by
-
Location
-
Job Reference
-
Facilities Serviced
Facilities Serviced
- Swimming Pool
Poolside
-
Cover Present
-
Is cover Operational
-
Is a cover pit/housing present
-
Is the cover pit clear of debris and drainage present?
-
Cleaned
-
Access type
-
Is the rail secure and safe for operation
-
Is the rail secure and safe for operation
-
Water Clarity
-
Water Level
-
Lights Operational
-
Cleaning performed
-
Vacuum
-
Brush
-
Net
-
Tile Band
Pool Plant
Panel Readings
-
Dosing Controller Present
-
Panel Make/Model
-
Chlorine
-
pH
-
Dosing Controller Strainer Cleaned (If Present)
Manual Testing
-
Free Chlorine
-
Action Taken to Increase Level
-
Action Taken to Reduce Level
-
Total Chlorine
-
Combined Chlorine
-
pH
-
Action taken to Increase Level
-
Action taken to Reduce Level
-
Alkalinity
-
Action taken to increase level
-
Calcium Hardness
-
TDS
-
Temperature
-
Dosing unit Calibrated
Chemical Dosing/Storage
-
Chemicals Manually Dosed
-
What has been dosed and at what quantity
-
Chlorine Tank Level (Liters)
-
Chlorine Tank Filled (Liters)
-
Acid Tank Level (Litres)
-
Acid Tank Filled (Liters)
-
Chlorine Present Outside of Tank (Litres)
-
Acid Present Outside of Tank
-
Condition of Chlorine Injector
-
Injector Cleaned
-
Condition of Acid Injector
-
Injector Cleaned
Primary Filtration
-
Number of Filters in Operation
-
Backwash Performed
-
for how long in minutes
-
Rinse Performed
-
Number of Pumps in Operation
-
Pump Basket Emptied
-
Pressure on Completion
Secondary Filtration/Disinfection
-
UV Present
-
Make/Model
-
Operational
-
Hours Run (If Present)
-
PAC/FLOC Dosing Present
-
Tank Filled
-
Pump Operational
-
Ozone Present
-
Operational
Spa/Vitality Pool
Poolside
-
Water Clarity
-
Water Level
-
Lights Operational
-
Cleaning performed
-
Vacuum
-
Brush
-
Net
-
Tile Band
Pool Plant
Panel Readings
-
Dosing Controller Present
-
Panel Make/Model
-
Chlorine
-
pH
-
Dosing Controller Strainer Cleaned (If Present)
Manual Testing
-
Free Chlorine
-
Action Taken to Increase Level
-
Action Taken to Reduce Level
-
Total Chlorine
-
Combined Chlorine
-
pH
-
Action taken to Increase Level
-
Action taken to Reduce Level
-
Alkalinity
-
Action taken to increase level
-
Calcium Hardness
-
TDS
-
Temperature
-
Dosing unit Calibrated
Chemical Dosing/Storage
-
Chemicals Manually Dosed
-
What has been dosed and at what quantity
-
Chlorine Tank Level (Liters)
-
Chlorine Tank Filled (Liters)
-
Acid Tank Level (Litres)
-
Acid Tank Filled (Litres)
-
Chlorine Present Outside of Tank (Litres)
-
Acid Present Outside of Tank
-
Condition of Chlorine Injector
-
Injector Cleaned
-
Condition of Acid Injector
-
Injector Cleaned
Primary Filtration
-
Number of Filters in Operation
-
Backwash Performed
-
For how long?
-
Rinse Performed
-
Number of Pumps in Operation
-
Pump Basket Emptied
-
Pressure on Completion
Secondary Filtration/Disinfection
-
UV Present
-
Make/Model
-
Operational
-
Hours Run (If Present)
-
PAC/FLOC Dosing Present
-
Tank Filled
-
Pump Operational
-
Ozone Present
-
Operational
Booster Pumps and Air Blower
-
Air Blower Present
-
Booster Pump Present
-
Unit Operational
-
Basket Cleared
Steam Room
Cabin Side
-
Unit in Use
-
Temp in Cabin
-
Condition of Internals (Tiling and Seating)
Generator
-
Model of Steam Generator And Serial No.
-
Cylinder Serial No. (If Present)
-
Operational
-
Running Temperature
-
Set Point Temperature
-
Descale
-
Are Any Leaks Present
-
Essence Dosing Present
-
Tank Filled
-
Dosing Pump Operational
Sauna
Cabin Side
-
Unit in Use
-
Thermometer Present
-
Thermometer Temp Reading
-
Condition of Internals (Seating/Flooring/Heat Protection)
Stove
-
Stove Make/Model
-
Power Rating (kW)
-
Are all elements in operation
-
Cabin Temperature (Manual Reading)
-
Stove Temperature Set Point
-
Condition of Stove Rocks (If Present)
-
Essence Dosing Present
-
Are all dosing channels clear of scale and solidified essence.
-
Has this now been cleaned
-
Tank Filled
-
Dosing Pump Operational
Water Feature
Featureside
-
Water Clarity
-
Water Level
-
Lights Operational
-
Cleaning performed
-
Vacuum
-
Brush
-
Net
-
Tile Band
Feature Plant
Panel Readings
-
Dosing Controller Present
-
Panel Make/Model
-
Chlorine/Redux
-
pH
-
Dosing Controller Strainer Cleaned (If Present)
Manual Testing
-
Free Chlorine
-
Action Taken to Increase Level
-
Action Taken to Reduce Level
-
Total Chlorine
-
Combined Chlorine
-
pH
-
Action taken to Increase Level
-
Action taken to Reduce Level
-
Alkalinity
-
Calcium Hardness
-
TDS
-
Temperature
-
Dosing unit Calibrated
Chemical Dosing/Storage
-
Chemicals Manually Dosed
-
What has been dosed and at what quantity
-
Chlorine Tank Level
-
Chlorine Tank Filled
-
Acid Tank Level
-
Acid Tank Filled
-
Chlorine Present Outside of Tank
-
Acid Present Outside of Tank
-
Condition of Chlorine Injector
-
Injector Cleaned
-
Condition of Acid Injector
-
Injector Cleaned
Primary Filtration
-
Number of Filters in Operation
-
Backwash Performed
-
Rinse Performed
-
Number of Pumps in Operation
-
Pump Basket Emptied
-
Pressure on Completion
Secondary Filtration/Disinfection
-
UV Present
-
Operational
-
Hours Run (If Present)
-
PAC/FLOC Dosing Present
-
Tank Filled
-
Pump Operational
-
Ozone Present
-
Operational
NOTES:
-
Any further comments?
Completion
-
Technician Signature
-
Client Signature
-
Client Comments
-
Motive8 Ltd, Gibraltar House, Rodd Estate
Off Fairwater Drive
Govett Avenue, Shepperton
TW17 8AB
(0)20 8481 9700
m8group.co.uk
poolservice@m8group.co.uk
Upon completion of your maintenance works a copy of this job sheet will be downloaded to your document viewing platform. Any recommended parts or further works will be quoted and sent to the contact we have for the site. Please allow up to 10 working days for this to happen.
Any machine placed in the failed and non-operational category are treated with urgency and a notification would have already been sent to our maintenance team