Information
-
Document No.
-
Audit Title
-
Client / Site
-
Conducted on
-
Prepared by
-
Location
-
Personnel
-
INSPECTION REPORT FOR POWER FACTOR CORRECTION UNITS
CVSG ASSET SERVICES PTY LTD
ABN 62 128 821 698
INSPECTION DETAILS
-
Select date
-
NAME OF PERSON UNDERTAKING TESTS
-
NAME OF FACILITY?
-
Add location
-
SWITCHBOARD NUMBER
-
SWITCHBOARD TYPE
-
ASSET NO. BAR CODE AVAILABLE?
-
ENTER BARCODE
PRE ISOLATION INSPECTION
-
Are there any existing alarm conditions on the controller?
-
Record details of existing alarm code
-
Record the number of stages energised
-
Record the power factor
-
Record as found current, voltage and watts/VA/VARs and compare with previous results
-
Take a photo of the PFC and then also take photos of each physical step.
ISOLATED INSPECTION
-
Isolate Unit
-
Check for any sign of overheating.
-
Check the interior of the unit and air vents
-
Check tightness of all connections, including torque settings on contactor connections
-
Visually check capacitors and reactors for any damage
-
Re-energise the unit
-
Check the voltage sensing circuits and alarms
-
Check fan operation
-
Record as left current, voltage and watts/VA/VARs
-
Provide detail of follow up if required.
INSPECTION COMPLETE
-
Add signature