Title Page

  • Post Job Field Audit

  • Contractor

  • Conducted on

  • Prepared by

  • Location
  • Crew Leader:

  • Contractor:

  • District/Division:

  • Job #/ Work Order #

  • Job Description:

  • Job Completion Date:

Inspection/Installation Evaluation

  • Drawings/Job As-Builts Accurate

  • Adherence to Job Drawings

  • Crew Worked Within Jobsite restrictions

  • Specifications Followed

  • Verified Footage for Project

  • Information Complete/Accurate for T&M Charges

  • Materials Returned or Packaged for Return

  • Concrete/ Asphalt Replaced

  • Work Site Restored

  • Overall Work Quality

  • Overall Site Appearance Acceptable

Comments:

Actions:

Notes:

  • Ameren Supervisor

  • Contractor Auditor

The templates available in our Public Library have been created by our customers and employees to help get you started using SafetyCulture's solutions. The templates are intended to be used as hypothetical examples only and should not be used as a substitute for professional advice. You should seek your own professional advice to determine if the use of a template is permissible in your workplace or jurisdiction. You should independently determine whether the template is suitable for your circumstances.