Title Page
-
Site conducted
-
Conducted on
-
Prepared by
Half Yealy Inspection Checklist
Half yearly
-
Fortnightly Calibration of gas leak detection system
-
Routine maintenance of the lifts
-
Water tanks cleaning and disinfection of water storage tanks
-
AHU and package units check belt drives and alignments, check drain pans
-
Ductable splits inspect for any refrigerant leaks air leaks in the ducts
-
Check AC grill temp
-
Check in compressor for operating if more than 5000 kindly have oil replaced
-
Check for AC units noise levels vibrations condenser fan blades
-
Check for electrical connections contactors loose and exposed wires all boxes closed
-
Clean and tighten all wire connections
-
Ensure all documents in place for compliance inspections..
-
Clinic medical equipment PPM is caried out by service provider
-
Whole school Bacteriological water analysis
-
Pool Bacteriological analysis
Signature Page
-
Add signature