Information
-
Job Number
-
Inspection Type
-
Lot Address
-
Conducted on
-
Site Manager
-
Inspector
-
Location
FIRST INSPECTION
-
Did the job pass
-
Is a re inspection required
REINSPECTION
-
Are all items complete
-
REINSPECTION CARRIED OUT BY
-
Select date
LANDSCAPE VIEW
-
Landscape view of all sides.
ENTRY
-
Walls straightened
-
Ceiling lines at walls OK
-
Ceiling trimming correct
-
Bulkheads/straight/level
-
Columns/straight/square
-
Door studs straightened
-
Plaster margin/door/wind OK
-
Area free of damage from rough in?
-
Hallway walls / parallel
-
General comments
GUEST ROOM
-
Walls straightened
-
Ceiling lines at walls OK
-
Ceiling trimming correct
-
Bulkheads/straight/level
-
Door studs straightened
-
Plaster margin/door/wind OK
-
Area free of damage from rough in?
-
Wall junctions blocked/nailed
GUEST / ENSUITE / POWDER ROOM
-
Walls straightened
-
Ceiling lines at walls OK
-
Ceiling trimming correct
-
Door studs straightened
-
Niche has fall to front if installed
-
Shower base installed & level (poly marble only)
-
Area free of damage from rough in?
-
Water resistant angles installed to concrete floor where required. Not required on timber floor.
-
Plaster margin 10mm around window
STUDY / SITTING
-
Walls straightened
-
Ceiling lines at walls OK
-
Ceiling trimming correct
-
Bulkheads/straight/level
-
Door studs straightened
-
Columns/straight/square
-
Plaster margin/door/wind OK
-
Area free of damage from rough in?
-
Wall junctions blocked/nailed
FAMILY
-
Walls straightened
-
Ceiling lines at walls OK
-
Ceiling trimming correct
-
Bulkheads/straight/level
-
Door studs straightened
-
Plaster margin 10mm around window
-
Area free of damage from rough in?
-
Wall junctions blocked/nailed
KITCHEN
-
Walls straightened
-
Ceiling lines at walls OK
-
Ceiling trimming correct
-
Bulkheads/straight/level
-
Door studs straightened
-
Plaster margin 10mm around window
-
Area free of damage from rough in?
-
Wall junctions blocked/nailed
BUTLERS PANTRY
-
Walls straightened
-
Ceiling lines at walls OK
-
Ceiling trimming correct
-
Door studs straightened
-
Plaster margin 10mm around window
-
Area free of damage from rough in?
-
Wall junctions blocked/nailed
DINING/MEALS
-
Ceiling lines at walls OK
-
Walls straightened
-
Ceiling trimming correct
-
Bulkheads/straight/level
-
Door studs straightened
-
Plaster margin 10mm around window
-
Area free of damage from rough in?
-
Wall junctions blocked/nailed
RUMPUS / THEATRE
-
Walls straightened
-
Ceiling lines at walls OK
-
Ceiling trimming correct
-
Bulkheads/straight/level
-
Door studs straightened
-
Plaster margin 10mm around window
-
Area free of damage from rough in?
-
Wall junctions blocked/nailed
LAUNDRY
-
Ceiling lines at walls OK
-
Walls straightened
-
Ceiling trimming correct
-
Bulkheads/straight/level
-
Door studs straightened
-
Plaster margin 10mm around window
-
Area free of damage from rough in?
-
Wall junctions blocked/nailed
LEISURE/CHILD'S RETREAT
-
Ceiling lines at walls OK
-
Walls straightened
-
Ceiling trimming correct
-
Bulkheads/straight/level
-
Door studs straightened
-
Plaster margin 10mm around window
-
Area free of damage from rough in?
-
Wall junctions blocked/nailed
MASTER BEDROOM
-
Walls straightened
-
Ceiling lines at walls OK
-
Ceiling trimming correct
-
Bulkheads/straight/level
-
Door studs straightened
-
Plaster margin 10mm around window
-
Area free of damage from rough in?
-
Wall junctions blocked/nailed
MASTER ENSUITE
-
Walls straightened
-
Ceiling lines at walls OK
-
Ceiling trimming correct
-
Door studs straightened
-
Water resistant angles installed to concrete floor where required. Not required on timber floor.
-
Niche has fall to front if installed
-
Shower base installed & level (poly marble only)
-
Bath hob built and level
-
Area free of damage from rough in?
MASTER WIR
-
Walls straightened
-
Ceiling lines at walls OK
-
Ceiling trimming correct
-
Door studs straightened
-
Noggins to robe returns at 1650mm
-
Plaster margin 10mm around window
-
Area free of damage from rough in?
-
Wall junctions blocked/nailed
WC1
-
Walls straightened
-
Ceiling lines at walls OK
-
Ceiling trimming correct
-
Door studs straightened
-
Plaster margin 10mm around window
-
Area free of damage from rough in?
-
Wall junctions blocked/nailed
WC2
-
Walls straightened
-
Ceiling lines at walls OK
-
Ceiling trimming correct
-
Door studs straightened
-
Plaster margin 10mm around window
-
Area free of damage from rough in?
-
Wall junctions blocked/nailed
STAIRWELL
-
Walls plumb through first floor
-
Walls straightened
-
Ceiling lines at walls OK
-
Ceiling trimming correct
-
Plaster margin 10mm around window
-
Area free of damage from rough in?
-
Wall junctions blocked/nailed
BEDROOM 2
-
Ceiling lines at walls OK
-
Walls straightened
-
Ceiling trimming correct
-
Door studs straightened
-
Plaster margin 10mm around window
-
Area free of damage from rough in?
-
Wall junctions blocked/nailed
BEDROOM 3
-
Ceiling lines at walls OK
-
Walls straightened
-
Ceiling trimming correct
-
Door studs straightened
-
Plaster margin 10mm around window
-
Area free of damage from rough in?
-
Wall junctions blocked/nailed
BEDROOM 4
-
Walls straightened
-
Ceiling lines at walls OK
-
Ceiling trimming correct
-
Door studs straightened
-
Plaster margin 10mm around window
-
Area free of damage from rough in?
-
Wall junctions blocked/nailed
REAR HALLWAY
-
Walls straightened
-
Ceiling lines at walls OK
-
Ceiling trimming correct
-
Door studs straightened
-
Plaster margin 10mm around window
-
Area free of damage from rough in?
-
Wall junctions blocked/nailed
BATHROOM / ENSUITE 2
-
Walls straightened
-
Ceiling lines at walls OK
-
Ceiling trimming correct
-
Door studs straightened
-
Plaster margin 10mm around window
-
Water resistant angles installed to concrete floor where required. Not required on timber floor.
-
Bath hob built and level
-
Niche has fall to front if installed
-
Shower base installed & level (poly marble only)
-
Area free of damage from rough in?
ENSUITE 3
-
Ceiling lines at walls OK
-
Walls straightened
-
Ceiling trimming correct
-
Door studs straightened
-
Plaster margin 10mm around window
-
Niche has fall to front if installed
-
Shower base installed & level (poly marble only)
-
Area free of damage from rough in?
ENSUITE 4
-
Ceiling lines at walls OK
-
Walls straightened
-
Ceiling trimming correct
-
Door studs straightened
-
Plaster margin 10mm around window
-
Niche has fall to front if installed
-
Shower base installed & level (poly marble only)
-
Area free of damage from rough in?
OUTDOOR LIVING / ALFRESCO
-
Ceiling lines at walls OK
-
Ceiling battened at 450 centres and perimeter nogged out
-
If brickwork is complete, is it clear of the beams
-
Are the external doors free of any damage
-
Are the infill s over the external doors complete if required
-
Area free of damage from rough in?
PORTICO
-
Ceiling lines at walls OK
-
Ceiling battened at 450 centres and perimeter nogged out
-
If brickwork is complete, is it clear of the beams
-
Are the external doors free of any damage
-
Area free of damage from rough in?
GARAGE
-
Ceiling lines at walls OK
-
Walls straightened
-
Ceiling trimming correct & perimeter nogs installed
-
Door studs straightened
-
Floor clear of damage
-
Area free of damage from rough in?
-
General comments
BRICKWORK (IF COMPLETE)
-
Bed joints straight and even, 10mm thick not varying by + or - 3mm in thickness
-
Perpends 10mm not exceeding + or - 5mm and not varying by more than 8mm in a wall.<br>
-
Brickwork overhang OK
-
Mortar colour and consistent throughout
-
Brick piers square to the house
-
Are there any blowouts that need to be repaired
-
Clearance to the sill is correct
-
General comments
EXTERNAL
-
Site Cleaned & sloping away from building perimeter
-
Roof tiles bedded and pointed / Tin roof completed
-
Water connected / under pressure
-
Gas line run in complete
-
HWS over flow point brought to surface on left side of HWS pad?
-
Lot sign on and filled in.
-
Eaves complete
-
Infills to windows complete if required.
-
Temp fence installed and secure.
-
Temp down pipes installed. Note if they require maintenance
-
General Comments
Balcony
-
Any damage from rough in
-
Balcony wastes installed
-
Balcony deck is plumb and is sufficiently supported so as not to flex
-
Handrail spigots installed at time of inspection ( If required)
-
Fall protection in place if required
REAR BALCONY
-
Any damage from rough in
-
Balcony wastes installed
-
Balcony deck is plumb and is sufficiently supported so as not to flex
-
Handrail spigots installed at time of inspection ( If required)
-
Fall protection in place if required
OTHER ITEMS
-
Heating/cooling ducts installed
-
Insulation complete
-
Electrical rough in complete
-
Plumbing rough in complete
-
Ducted vacuum roughed in if required
-
Alarm system roughed in if required
-
AG pipes situated 1500mm off house.
-
Check sarking for gaps and holes. Extends over ridge line. Anti ponding boards installed
OVERALL GENERAL COMMENTS
-
Any comments not covered by above categories