Information

  • Client / Site naming convention is:
    Job Number - Drawing Number or alternatively (...)
    i.e. Job Number (Client) - Drawing Number (Panel Number)
    eg. 1234 - WP1

  • Client / Site

  • Document No.

  • Bed Number

  • Panel Thickness

  • Location
  • Conducted on

  • Prepared by

How to complete this inspection.

  • Questions require visual inspection only.
    Verify requires a dimensional check.
    Checked dimensions are to be identified on the shop drawing with blue pen.

Bed Preparation

  • is the bed surface clean/ polished?<br>

  • Are all holes filled and dressed back?

  • Has the bed release agent been applied?

Formwork Setup

  • Is formwork correct size for required panel thickness?

  • Is formwork straight and secured to the bed with sufficient magnets or screws?

  • Verify formwork been checked for square?

  • Verify all formwork dimensions correct?

  • Photo - Shop Drawing with Dimensions checked-off/ highlighted.

  • Is formwork clean and sealed correctly?

Check the following Cast-in components are correctly positioned and within tolerance.

  • Verify Structural Ferrules [+/- 1mm]<br>

  • Photo - Detail of Structural Ferrule positioning.

  • Propping Ferrules [+/- 50mm] &<br>MIN 300mm to edge of panel.

  • Verify Grout Tubes [+/-3mm] & <br>Perpendicular to panel edge.

  • Photo - Detail of Grout Tube positioning and perpendicularity.

  • Verify Lifters [+/-20mm, &<br>+/-5mm (across thickness)]

  • Record lifter W.L.L.

  • Are the lifters the correct type and W.L.L?<br>(as required on shop drawing)

  • Written Engineering approval required prior to making this change!

  • Photo - Detail of Lifter positioning & reinforcement.

  • Verify Cast in items [+/-3mm]

  • Verify Rebates<br>(as required on shop drawing)<br>

  • Verify Small Penetrations<br>(as required on shop drawing)

  • Verify all openings the correct size, square and position/orientation?<br>(as required on shop drawing)<br>

Reinforcement

  • Record the reinforcement mesh

  • Has the correct reinforcement mesh been used?<br>(as required on shop/ reinforcement drawing)<br>

  • Written Engineering approval required prior to making this change!

  • Record the reinforcement/ perimeter bar.

  • Has all reinforcement and perimeter bar been correctly placed with required overlap?<br>(as required on shop/ reinforcement drawing)

  • Written Engineering approval required prior to making this change!

  • Verify minimum concrete cover is achieved?<br>(as required on shop drawing)

  • Photo - General arrangement of all Reinforcement.

Concrete

  • Does the concrete mix satisfy the project requirements? (Strength&Slump)

HOLD POINT - Release

  • The panel setup has been reviewed in accordance with the checks detailed within and any necessary corrections have been incorporated

  • This panel is approve for concrete placement.

  • Quarantine panel and raise NCR.
    Record this reports Client/ Site description on the NCR
    The NCR process shall then be used to implement corrective action.

  • Add signature

The templates available in our Public Library have been created by our customers and employees to help get you started using SafetyCulture's solutions. The templates are intended to be used as hypothetical examples only and should not be used as a substitute for professional advice. You should seek your own professional advice to determine if the use of a template is permissible in your workplace or jurisdiction. You should independently determine whether the template is suitable for your circumstances.