Title Page
-
Document No.
-
Press
-
Crew #
-
Conducted on
-
Michael Kirby
-
Sapa Gainesville
-
Personnel
-
Die and order number used for audit
-
Is die temperature 800 degrees minimum?
-
Is minimum exit temperature being achieved?
-
Are press instructions available? ( e.g. recent 1 point lesson)?
-
Are press instructions being followed?
-
Is surface quality checked within 1st three billets of the order?
-
Is surface quality checked every 10 billets?
-
Are critical dimensions and angles checked within the 1st billets of the order?
-
Are critical dimensions and angles checked every 10 billets?
-
Does die dash on die match SCS?
-
Is a sample painted to access the surface quality for pickup, die lines, and flow lines?
-
Is operator entering QC every 10 billets?
-
Is operator pulling the samples for the QC check from the proper
-
On certified orders, if a delay of 60 seconds or greater occurs, did operator scrap delayed billet?
-
Are under table fans clean from debris? Fans working?
-
Is Puller 2 takeaway speed set to match SCS ram speed on certified orders.?
-
Are all gages and tools calibrated. (Current Date)
-
Does the Container look good<br>
-
Has the die alignment check been completed and OK
-
Is the cast number and alloy correct for die
-
Measure cooling rate - does cooling rate and temperatures meet requirements of Cert road map
-
Is press team using SCS die oven menu to track dies in the oven.