Title Page
-
Press Number
-
SWI Name/# and Rev#
-
Area Team Leader
- Eric
- John
- Paul
- Rob
- Stacey
- Terry
-
Department
-
Operator/Empl# Audited
-
Conducted on
-
Shift
Documentation Control
-
Does the SWI revision number in the binder match the current controlled version on the network? (Directory path: "F:\ISO-IATF 16949\Standardized Work Instructions".
-
Does the Employee Training Matrix reflect Operator has been sufficiently trained for work task he/she is performing and is Operator signed-off to SWI, Quality Alerts and Modification Bulletins?
-
Are all stakeholders (Eng, Mgr, Day TL, Aft TL, Night TL, Quality) signed off on the revision?
-
Can worker locate ALL SWI's, Modification Bulletins & Quality Alerts for this job/station?
Use of work instructions. (Observe 5 to 10 cycles)
-
Is the worker using PPE as intended?
-
Please STOP, correct issues, and record nature of problem.
-
Does the worker follow the order of major steps defined in the SWI? (no prompt)<br>(If not, possible actions include additional employee training or issuing a Form 0504 Modification Bulletin and initiating a permanent SWI change using Form# 4854.).
-
For each process step, can the worker state key point(s) and explain why they're important? (prompt)
-
Are all regular, periodic tasks reflected in the SWI?
-
For IMM AUDIT ONLY: Are safety & quality triangles at press filled out by all shifts?<br>For RIM AUDIT ONLY: Inspect gate area - if Matl in gate, counsel Operator & verify after 1 HR.
Leadership in Standardized Work.
-
Safety, ergonomic and environmental conditions appear OK?
-
Please STOP, correct issue, and record the nature of the problem.
-
Have you considered if there are opportunities to further mitigate risk (as reflected on the job Risk Assessment)?
-
Did you ask the worker if he/she has any ideas for improvement?
-
What were the employee's ideas for improvement, if any?
-
Tools, gauges, scales, fixtures, aids, samples: available and in good condition, and calibration stickers are up to date?
-
ALL action items from last audit of this SWI have been 100% closed by the due date?
-
*ADD "Detailed Observations..." TO STANDARDIZED WORK OPEN ISSUES LIST IMMEDIATELY FOLLOWING AUDIT COMPLETION.
-
Auditor
-
Team leader