Team Board: Communication and Problem Resolution Process

  • Current Management LPA results (completed within the last month) are recorded in the 'Management LPA Review' section.

  • The Management Board Review was completed in the previous week.

  • Numeric and Red/Green shift results for the last 24hrs have been recorded.

  • Where target has not been met, an explanation exists including occurrence date, containment/corrective actions and owner.

  • All SQTCM (Safety, Quality, Timing, Cost, Motivation) and audit-related actions listed on the front of the board are also captured on the appropriate Actions Log inside the board.

  • 5S & SWI Audit results have been updated to Schedule/Trend Graphs.

Team Member Process Checks

  • Have all Ops completed pre-shift safety inspection (where applicable)?

  • Are all Ops current on their 5S tasks (where applicable)?

  • Are previous day's TPM signoffs current (where applicable)?

Area Specific Contents (As determined by Area TL with Quality Support)

  • Are rework operators inspecting parts for TPO residue and using a 1500 foam pad to remove?

  • Does the paint label match the scribe on part (LH vs RH)?

  • Are the post protectors being used when unloading moulded WIP racks?

  • Are racks at load deck one level high at most? (Not stacked)

  • Please enter Auditor's Signature

The templates available in our Public Library have been created by our customers and employees to help get you started using SafetyCulture's solutions. The templates are intended to be used as hypothetical examples only and should not be used as a substitute for professional advice. You should seek your own professional advice to determine if the use of a template is permissible in your workplace or jurisdiction. You should independently determine whether the template is suitable for your circumstances.