Information

  • Site conducted

  • Form

  • Conducted on

  • Conducted by

  • Site / Premises Manager

Main access route to the main/proposed site entrance.

  • Is there a One way system in place

  • Is Main access road to the site sufficient?

  • Insert photo and record width of road

  • Are there any restricted traffic calming sections on the main road?

  • Has any railings/bollards or other restrictions to be removed for deliveries.

  • Insert Picture

  • Will local parking be an issue.

  • Record current parking issues.

  • Will traffic management company be required?

  • Is a Haulier and crane route survey required.

  • Record the date this is required by.

Trees/branches and overhead obstructions ( access externally)

  • Are there any obstructions preventing access to main entrance & exit?

  • Tree surgery

  • Record action required,

  • Low bridges/gantries

  • Overhead cables

  • Any other obstructions.

Entrance into the proposed Site

  • Dimension of access gates/entry (**Record if temporary access is to be formed through existing walls/fencing etc**)

  • Width of entrance gates.

  • Are there any height restrictions on accessing the site?

  • Height of any over head restrictions (add photo too)

  • Is The Site entrance wide enough to allow access to site and level

  • Detail what works is required to allow access.

  • Insert photos

  • Width of entrance road into the site.

  • Any gates or barriers within school restricting access.<br>

  • Any gates/railings/fences/ bollards needed to be temporary removed.

  • Any restrictions from lamp posts/bollards etc

  • Access road to proposed area wide enough for vehicles.

  • Will parking within the school be an issue

  • Detail measures required or agreed to ensure access is sufficient

  • Is Track-way from site entrance to proposed area required

  • Approx linear meters of trackway required.

  • Can vehicles turn around within the site area.

  • Detail measures required or agreed to ensure access is sufficient

  • Is protection of existing surfaces including road access/grassed areas/play areas/kerbs/paving etc. Required.

  • Are there any Ground conditions or large services underground which may effect the installation?

  • Is the Site reasonably level?

Proposed building location.

  • Is there planning required for the project?

  • Who has responsibility for planning

  • Has location been fixed and is planning in place.

  • Insert google/drone image or drawing image.

Building Control Notifications

  • Who has responsibility for Building Control/BCMS

  • Has the FSC and DAC been issued to Procon?

Record Surveys Available

  • Has a utility search been carried out for all mains services (culverts- way leaves)

  • Is a GPR or underground survey of the area available/carried out?

  • Is TOPO survey of the area available/carried out.

  • Is a GI survey of the area available/carried out?

  • Is the location in a flood risk zone?

  • Are any ponds within the site location? (are newts or other protected species in location)

  • Are there any trees or large foliage areas to be removed?

  • Is the proposal for removal outside nesting season? 1st March - End August.

  • Are there any signs of bird nests or bats etc..

  • Will a breeding bird survey be required.

  • Will demolition of existing buildings be required?

  • Has an R&D survey been completed if the building/structure was constructed pre 2000.

  • Are there signs of bats or bird habitat in buildings to be demolished.

  • Is an R&D asbestos survey available for service routes of new services.

  • Are there any buildings close to proposed building location? Will notional boundary calculations be required.

  • Details of existing building taken. Measurements of unprotected area recorded.

  • Distance of existing building or boundary to proposed location

  • Approximate m2 of unprotected area on existing building. (Ensure photo evidence of existing buildings and measurements are taken)

  • Is the Location of closest hydrant known? Within 100 m of the proposed location (for buildings with fire compartment over 280 m2)

  • Distance of hydrant to proposed location.

  • Adequate access for fire appliances to location of new building.(45m radius)

  • Any evidence of discarded waste in the location? (Covered mounds/rubble from demolition )

  • Are details of the waste known? Is the waste contaminated ?

  • Any evidence of previous storage underground storage/fuel tanks.

Foundations and proposed building levels.

  • Building to achieve level access.(state ground conditions i.e bitmac/grass etc.)

  • Will a ramp or any steps be required.

  • Proposed site area suitable?

  • Will extensive "cut in" or change/build up in levels be required

  • Proposed for pads/strips

  • Detail proposal for foundations if known.

  • Are any trees close to proposed area of foundations. Will heave protection be required?

  • Are there any existing structures close to the proposed new building area - Undermining to be considered?

  • Drainage to be installed prior to delivery of units?

Services

  • Are existing services record drawings available.

  • Existing service records.
  • Is there a Record of existing services as built drawings available?

  • Insert drawing.

  • Proposed water connection point known?

  • Proposed electrical connection point known?

  • Existing consumer unit including fuse types evidence

  • Procon will need the periodic test cert for the electrical panel where the proposed connection point is.

  • Existing fire alarm panel/provider

  • Fire alarm

  • Existing intruder alarm

  • Intruder alarm

  • Proposed data connection point (comms room)

  • Data connections

  • Confirm the proposed heating strategy.

  • Proposed area for air-con units

  • Proposed gas connection point

  • Proposed oil connection point

  • Location for units confirmed.

  • State heat source.

  • Proposed storm connection point known? (insert photos too)

  • Proposed foul connection point known? (insert photos too)

  • Are invert levels available to establish sufficient falls.

Cranes

  • Is the crane set up location known?

  • Crane requirements. (show all set up locations)

  • Crane Requirements.
  • Proposed area for crane setup

  • Estimated lifting reach. Crane position 1.

  • Estimated crane size.

  • Type of crane required

Lorry Choice

  • Type of Lorry required

  • Will a change from low loader to flat bed be required.

Unit location,Welfare units ,Materials and plant storage

  • Compound area agreed?

  • Site welfare set up.

  • Insert marked up google map or drone image of the proposed locations. Include proposed service areas,manholes,hydrants etc..

  • Sufficient space for Procon skips to segregate waste materials within site compound

Existing Dilapidation

  • Is there existing damage to surfaces/gates/fencing etc. Within the grounds.

  • Existing damage to property or roads/kerbs for proposed delivery route.

  • Existing Damage.
  • Evidence

Misc or details of finishes: external & internal required to match existing where possible.

  • Details of miscellaneous below:

  • Pictures of miscellaneous

  • Google map or drone image of location and early presumptions.

The templates available in our Public Library have been created by our customers and employees to help get you started using SafetyCulture's solutions. The templates are intended to be used as hypothetical examples only and should not be used as a substitute for professional advice. You should seek your own professional advice to determine if the use of a template is permissible in your workplace or jurisdiction. You should independently determine whether the template is suitable for your circumstances.