Amicus Contractor Commissioning Document
-
Conducted on
-
Contractor Company Name
-
Contractor Name
-
Contractor Contact Number
-
End User Name (Site Name)
-
Site Address
-
Room Name/Number/s
Installation
-
Equipment has been installed as per the design<br>documentation
-
Equipment has been mounted securely in accordance with<br>manufacture recommendations
-
Room has been left clean and tidy
Audio I/O
-
All audio inputs are working as per the design spec
-
All audio outputs are working as per the design spec
-
Audio devices firmware is updated
-
Speakers and functional and optimally positioned
-
Settings for Microphone for Conferencing and Speaker for Conferencing set to intended audio peripherals
-
Microphone functional and optimally positioned
-
Settings for Default Speaker set to the intended audio peripheral
Video I/O
-
All video inputs are working as per the design spec
-
All video outputs are working as per the design spec
-
Camera functional and positioned optimally
-
Camera Firmware is updated
Control
-
Control interfaces are active and working as per the design<br>spec and/or manufacture expectations
-
Select date
Network
-
Have all devices been connected to the network?
-
Additional Comments
Handover
-
System testing has been conducted, client is satisfied
-
Client training completed
-
Rubbish cleared offsite and site ready for handover
-
Client Name
-
Client Signature
-
Contractor Name
-
Contractor Signature
-
Outstanding items:
-
Comments/notes/defects
Photos
-
Photos