Information

  • Document No.

  • Property Address

  • Property Backflow Assessment

  • Conducted on

  • For:

  • HMM Inspection Services Pty Ltd 5B Robinlee Avenue BURWOOD EAST. VIC Ph: 9887 8414

  • Personnel

Site

  • Site photo

Meter Assembly

  • Does meter assembly comply

  • Does back flow requirements comply

Materials

  • Has approved pipework coloured PURPLE been installed

  • Has approved marker tape been installed

Installation

  • Has approved clearances been provided

  • Has the appropriate pipe bedding material been installed

  • Has the approved cover been provided

  • Has the pipework been pressure tested

  • Satisfactory drinking water interconnection provided

Water meter details

  • What is the potable water meter No.

  • What is the recycled water meter No.

  • Additional Comments

Result

  • Installation result

  • Rectification a required

Photos

  • Add photo of meter assembly and pipework

The templates available in our Public Library have been created by our customers and employees to help get you started using SafetyCulture's solutions. The templates are intended to be used as hypothetical examples only and should not be used as a substitute for professional advice. You should seek your own professional advice to determine if the use of a template is permissible in your workplace or jurisdiction. You should independently determine whether the template is suitable for your circumstances.