Information
-
Document No.21
-
PV System Installation
-
Client/Site Mr Powell
-
Conducted on
-
Installation by
-
Location
-
Personnel
-
Distance to job
1.0 - Type of PV Installation
-
1.1 - Is the installation a stand alone installation ?
-
1.2 - Is the Installation a grid connect Installation
2.0 Risk assessment
-
2.1 Has a risk assessment been completed?
-
2.2 Have risk controls been defined and implemented?
3.0 - Switchboard
-
3.1 - Is there a main switch to isolate the normal incoming supply?
-
3.2 - Does the main switch for incoming supply a permanent label "Normal Supply MAiN SWITCH"?
-
3.3 - Is there a circuit breaker to act as a main switch to isolate the solar supply?
-
3.4 - Does the main switch solar have a permanent label "Solar Supply MAIN SWITCH" ?
-
3.5 - If the solar system is connected to a distribution board is the following sign on the main switchboard and all intermediate switchboards "WARNING DUAL SUPPLY ISOLATE SOLAR SUPPLY AT DISTRIBUTION BOARD_________________"?
-
3.6 - Is the following sign permanently fixed to the switchboard "WARNING Dual Supply isolate both Normal and Solar Supplies before working on this installation"?
-
3.7 - Is the following sign on the switchboard "SOLAR ARRAY ON ROOF Open Circuit Voltage________ Short Circuit Current ________"?
4.0 - Inverter
-
4.1 - Is there a double pole isolator or circuit breaker at the inverter input?
-
4.2 - Is there an ac isolator at the inverter?
-
4.3 - If the inverter is not adjacent to the switchboard, is the location information provided?
-
4.4 - Passed test for anti islanding.
5.0 - PV Array
-
5.1 - Is there a dc isolator adjacent to the array?
-
5.2 - Is the dc isolator accessible for ease of operation (not under panels)?
-
5.3 - Manufactures details.
-
5.4 - Open circuit voltage
-
5.5 - Sort circuit current
6.0 - Cabling
-
6.1 - Are LVIV dc cables identified?
-
6.2 - Are cables suitably fixed behind panels
7.0 - Labels
-
7.1 - PV label attached to switchboard enclosure (door)
-
7.2 - Warning label attached to conductors in pit
-
7.3 - Warning label attached to pillar
-
7.4 - Warning label attached at point of supply
Sign Off
-
Auditor's signature