1.0 - Type of PV Installation

  • 1.1 - Is the installation a stand alone installation ?

  • 1.2 - Is the Installation a grid connect Installation

2.0 Risk assessment

  • 2.1 Has a risk assessment been completed?

  • 2.2 Have risk controls been defined and implemented?

3.0 - Switchboard

  • 3.1 - Is there a main switch to isolate the normal incoming supply?

  • 3.2 - Does the main switch for incoming supply a permanent label "Normal Supply MAiN SWITCH"?

  • 3.3 - Is there a circuit breaker to act as a main switch to isolate the solar supply?

  • 3.4 - Does the main switch solar have a permanent label "Solar Supply MAIN SWITCH" ?

  • 3.5 - If the solar system is connected to a distribution board is the following sign on the main switchboard and all intermediate switchboards "WARNING DUAL SUPPLY ISOLATE SOLAR SUPPLY AT DISTRIBUTION BOARD_________________"?

  • 3.6 - Is the following sign permanently fixed to the switchboard "WARNING Dual Supply isolate both Normal and Solar Supplies before working on this installation"?

  • 3.7 - Is the following sign on the switchboard "SOLAR ARRAY ON ROOF Open Circuit Voltage________ Short Circuit Current ________"?

4.0 - Inverter

  • 4.1 - Is there a double pole isolator or circuit breaker at the inverter input?

  • 4.2 - Is there an ac isolator at the inverter?

  • 4.3 - If the inverter is not adjacent to the switchboard, is the location information provided?

  • 4.4 - Passed test for anti islanding.

5.0 - PV Array

  • 5.1 - Is there a dc isolator adjacent to the array?

  • 5.2 - Is the dc isolator accessible for ease of operation (not under panels)?

  • 5.3 - Manufactures details.

  • 5.4 - Open circuit voltage

  • 5.5 - Sort circuit current

6.0 - Cabling

  • 6.1 - Are LVIV dc cables identified?

  • 6.2 - Are cables suitably fixed behind panels

7.0 - Labels

  • 7.1 - PV label attached to switchboard enclosure (door)

  • 7.2 - Warning label attached to conductors in pit

  • 7.3 - Warning label attached to pillar

  • 7.4 - Warning label attached at point of supply

Sign Off

  • Auditor's signature

The templates available in our Public Library have been created by our customers and employees to help get you started using SafetyCulture's solutions. The templates are intended to be used as hypothetical examples only and should not be used as a substitute for professional advice. You should seek your own professional advice to determine if the use of a template is permissible in your workplace or jurisdiction. Any ratings or scores displayed in our Public Library have not been verified by SafetyCulture for accuracy. Users of our platform may provide a rating or score that is incorrect or misleading. You should independently determine whether the template is suitable for your circumstances. You can use our Public Library to search based on criteria such as industry and subject matter. Search results are based on their relevance to your search and other criteria. We may feature checklists based on subject matters we think may be of interest to our customers.