Information
-
Address
-
Job Number
-
Location
-
Conducted on
-
Prepared by
Inside of Home
ENTRY
-
Is this Room/Area complete and free of defects (excluding paint)?
ENTRY HALLWAYS
-
Is this Room/Area complete and free of defects (excluding paint)?
STUDY
-
Is this Room/Area complete and free of defects (excluding paint)?
LOUNGEROOM
-
Is this Room/Area complete and free of defects (excluding paint)?
DINING ROOM
-
Is this Room/Area complete and free of defects (excluding paint)?
FAMILY ROOM
-
Is this Room/Area complete and free of defects (excluding paint)?
MEDIA ROOM
-
Is this Room/Area complete and free of defects (excluding paint)?
ACTIVITY ROOM
-
Is this Room/Area complete and free of defects (excluding paint)?
RUMPUS ROOM
-
Is this Room/Area complete and free of defects (excluding paint)?
THEATRE ROOM
-
Is this Room/Area complete and free of defects (excluding paint)?
BEDROOM (1)
-
Is this Room/Area complete and free of defects (excluding paint)?
BEDROOM (2)
-
Is this Room/Area complete and free of defects (excluding paint)?
BEDROOM (3)
-
Is this Room/Area complete and free of defects (excluding paint)?
BEDROOM (4)
-
Is this Room/Area complete and free of defects (excluding paint)?
BEDROOM (5)
-
Is this Room/Area complete and free of defects (excluding paint)?
BEDROOM (6)
-
Is this Room/Area complete and free of defects (excluding paint)?
KITCHEN
-
Is this Room/Area complete and free of defects (excluding paint)?
-
Is there termite stickers in under the kitchen sink?
PANTRY
-
Is this Room/Area complete and free of defects (excluding paint)?
LAUNDRY
-
Is this Room/Area complete and free of defects (excluding paint)?
-
Are there Paint touchup tins placed In laundry tub
BATHROOM
-
Is this Room/Area complete and free of defects (excluding paint)?
ENSUITE
-
Is this Room/Area complete and free of defects (excluding paint)?
POWDER ROOM
-
Is this Room/Area complete and free of defects (excluding paint)?
W.C.
-
Is this Room/Area complete and free of defects (excluding paint)?
ENSUITE (2)
-
Is this Room/Area complete and free of defects (excluding paint)?
GARAGE
-
Is this Room/Area complete and free of defects (excluding paint)?
-
Has the inverter/isolator been switched on for solar system ?
-
Are there any spare tiles placed in garage? (Roof, Wall & Floor)
OTHER
-
Paint touch ups to be complete as marked ?
-
Does the house require a reclean?
-
Any other items not listed above ?
EXTERIOR OF HOME
-
To 'Is slab edge in good condition and to the required 75mm barrier?
-
Is storm water kerb outlets in and in good condition ?
-
Are the windows clean and free of defects?
-
Is the garage door clean and free of defects?
-
Is the brickwork quality of a good standard i.e. bed joints consistent, brickwork clean, Mortar colour consistent ?
-
Is the Roof/Fascia/Gutter complete and free of defects?
-
Has the site been cleaned of all builders debris ?
-
Any other items not listed above ?
-
Construction Managers Signature
-
SUPERVISOR TO SIGN WHEN ITEMS ARE COMPLETED
Outside of Home
Building Areas
-
A minimum of 1.2m clear around the entire dwelling ?
-
Soil adjacent to dwelling graded away at 1:20 min (50mm/1m) ?
-
Are brick articulation joints installed as per the Engineer's requirement?
-
Trenches back filled and any site rubbish removed ?
-
Drainage installed behind cut zero boundary walls ?
-
Building platform free draining and graded to gully pits ?
Field Gully Pits / Downpipes
-
Spoon drains installed as per drainage plans ?
-
Field gully pits located as per drainage plan ?
-
Field gully pits installed to correct heights ?
-
Downpipes installed ?
Cut and Filled Batters
-
Cut batter angles correct to soil type ?
-
Fill batters angles correct to soil type ?
-
If the above answer/s are no are future retaining walls proposed on the supplied site plans ?
Driveways
-
Driveways installed ?
-
Are driveways by owners ?
-
Grated drains to driveway installed
Action to be taken
-
Please ensure all photos have been taken of every side of the home and all issues ?
-
Is further work to be arranged by supervisor to rectify issues ?
-
Supervisor must ensure works are rectified and photos sent to construction manager once complete