Information
-
Builder:
-
Work Order #:
-
Tract Name:
-
Lot#:
-
Employee Name:
-
Conducted on
-
Address:
-
Prepared by
Equipment Information
-
Equipment
-
Air Handler / Furnace
-
Make:
-
Model:
-
Serial #:
-
ID Coil
-
Make:
-
Model:
-
Serial #:
-
Condenser / Heat Pump
-
Make:
-
Model:
-
Serial #:
-
EFL / Energy Star Home
-
Ensure the room to room pressure differential is no more than +/- 3 Pascals - Record on Air Balance Form.
-
Verify fresh air intake filter is installed.
-
Verify all exhaust fans are 50 CFM's.
-
Verify programming of Fresh Air system & CFM's are entered properly.
-
Verify Merv 8 filters are installed.
-
Verify proper 90% venting.
General
-
Verify that all units/coils are level.
-
Water test drain pans with a minimum of 2 gallons of water each, ensuring there is little or no water left in the pan afterwards.
-
Verify proper pitch and drainage of both the primary & secondary condensate drain lines.
-
Ensure condensate P-trap & vent are installed correctly.
-
Inspect all condensate fittings for water leakage.
-
Condensate safety switch added?
-
Check system for any and all vibrations/noises & repair as necessary.
-
Verify t-stat is programmed if needed.
-
Zoning is set properly.
-
Perform system run test. Make any necessary repairs/adjustments & record info in the notes section below
-
Notes:
Recordables
-
Are there any issues?
Recordable
-
Call Type
-
Problem
- Not Ready
- Plan Conflict
- Schedule
- Schedule/Double Book
- Schedule/Dry Run
- Schedule/Late Notice
- Admin
- Engineering
- Field Super
- Field/RI
- Field/Trim
- Sales
- Service S/U
- Service Warranty
- Warehouse
- Repair
- Accuracy/Order Entry
- Accuracy/Picking
- Availability
- Quality
- Warranty/Parts
- Recordable Event
-
Notes about recordable:
-
Pictures of recordable:
Finish
-
QA Manager
-
Start-Up Technician