Title Page

  • Applicant Name:

  • Applicant Address:
  • APP ID:

  • Inspector

  • Location
  • Date and Time

INSTRUCTIONS

  • WHEN: When all permits have been approved, applicant has completely moved out of the damaged dwelling and power disonnect verification has been completed.
    This inspection must be completed within 48 hours of the demolition permit being issued.

  • PHOTOS: All Photos should be taken with a Timestamp Camera, and must include the Date, Time, Address of Property, and Lat & Long. Once all photos are taken, the inspector must download the photos to one PDF, and while on site, must email the file to 166_NCORR_OP@timberlinecg.com, and upload to the TCG Field App. Before leaving the site, inspectors must call Kiara Catro to get approval to leave.

  • ITEMS NEEDED FOR INSPECTION: Complete permit Package with copy of the proposed site plan approved for permitting & camera.

  • PHOTO's REQUIRED: 📸📸

  • Existing Power Pole

  • Driveway & property access

  • Culvert (Both sides)

  • Permit Box Showing Permits inside

  • Water Well (if Applicable)

  • The existing MHU from a distance (all 4 corners)

  • Exterior of additional buildings onsite

  • Blue Flag marking water source

  • Green Flag marking sewer source

  • Green Flag marking septic lid and field lines

  • White Flags marking mobile home placement

  • The existing MHU from a distance (all 4 corners)

Questions

  • Is the site ready for the Demolition?

  • Are the PODs obstructing demolition path? 📸📸

  • Have the applicant's belongings been moved out of the property?

  • Are there any obstructions for Demolition—fences, sidewalks, trees, powerlines? 📸📸

  • Are there any obstructions for MH delivery—fences, sidewalks, trees, powerlines? 📸📸

  • Is there existing excess debris or junk cars around the property? 📸📸

  • Have all Change Orders items to be removed been marked for Sub Contractor?📸📸

  • Have you completed the change order form? 📸📸

  • "Has the Power been disconnected or and meter removed? 📸📸

  • ***Take a picture up close showing the disconnection and from afar showing the house in the background."

  • Has the water been turned off at meter or well?📸📸

  • Has the Permit Box been deliverd and posted on site?📸📸

  • Picture of all 4 sides of house📸📸

  • Pictures of each interior room. Be sure to capture entire room. 📸📸

  • Picture of demo permit posted in window from a distance, showing house in picture📸📸

  • Picture of demo permit- up close to show writing📸📸

  • "Has the placement of the home been flagged with white flags per approved proposed

  • Site plan in permit package? 📸📸"

  • Does the proposed placement of the home meet municipality required setbacks?📸📸

Notes

  • Notes:

undefined

Signature:

  • Add signature

  • Date:

The templates available in our Public Library have been created by our customers and employees to help get you started using SafetyCulture's solutions. The templates are intended to be used as hypothetical examples only and should not be used as a substitute for professional advice. You should seek your own professional advice to determine if the use of a template is permissible in your workplace or jurisdiction. You should independently determine whether the template is suitable for your circumstances.