Information

  • Builder

  • Builder

  • Subdivision

  • Job Number

  • Sonoran Issues

  • Trade Damage

  • Inspected by

  • Conducted on

  • Signature

  • Items Corrected

  • Supiversor Name

  • Supervisor Signature

  • Date

  • Condensers checked - not damaged

  • Condensing Unit Level & Square Center of Pad

  • 3' Clearance from Walls/House/Clean-outs

  • Proper Clearance from Walls/House/Clean-outs

  • Refrigerant Line Connected

  • Armaflex Completed/Taped

  • Low Voltage Wire Secured

  • No Overhead Obstructions

  • Thermostat Wire Inside

  • S/A Registers Installed

  • R/A Grilles Installed

  • Filter Racks/Filters Installed/Fresh Air Filter

  • Combustion Air Grilles Installed with Screens

  • Exhaust Fan Trim Kits Installed

  • Hood Vent Final Connections

  • Dryer Vent Trim Kit

  • Exterior Caps, Collars, Flashings Installed

  • Secondary Drain Terminated with 90 degree Elbow

  • Primary Drain Terminated with 90 degree Elbow

  • W/H Platform Lined with Metal

  • Access Doors/Panels Connected

  • 300 psi Pressure Test

  • Job Complete per Plan

  • Is there any faulty equipment?

  • Add Equipment
  • Model #

  • Serial #

  • Problem

  • Is any one at fault?

  • Who?

  • Add Name
  • Enter Name

  • Notes:

The templates available in our Public Library have been created by our customers and employees to help get you started using SafetyCulture's solutions. The templates are intended to be used as hypothetical examples only and should not be used as a substitute for professional advice. You should seek your own professional advice to determine if the use of a template is permissible in your workplace or jurisdiction. You should independently determine whether the template is suitable for your circumstances.