Title Page
-
IHS Site ID
-
Installation Date
-
Installed By
-
QC Done By
Checklist
-
Has the gate been aligned?<br><br>(Ensure main gate sliding bolt can enter fully into adjacent slot and moves freely)
-
Is the lock installed level?<br><br>(Ensure all casings are level and no gaps are visible between spirit level and casing)
-
Is the welding neat and has fusion been made between metal’s?
-
Has the heat affected zone been cleaned and treated?<br><br>(Area affected by the heat of the welding, 5cm above and under the welded area )
-
Have all sheer off nuts been sheered off?
-
Have the bolts been flush cut with the sheer off nuts and tack welded on the<br>ends?
-
Has the lock been installed at the correct orientation in the casing?<br><br>(Ensure the LED's are visible through the two slots on the casing)
-
When you push the button on the back of the lock, do the lights come on?<br><br>(This will change to include lock and unlock )
-
Does the shackle enter the lock relatively freely?
-
Have all welding rod ends , sheer off nut heads and other debris been removed from site?
-
Did the installation pass? <br><br>(If no, give a reason)
-
Any additional information?