Information

  • Document No.

  • Audit Title

  • Client / Site

  • Conducted on

  • Prepared by

  • Location
  • Personnel

Layout

  • All drawings, specs, RFI's checked for this area?

  • Wall priority confirmed for rated wall intersections?

  • Are priority/fire wall indicators painted on the slab?

Framing

  • All drawings, specs, RFI's checked for this area?

  • Are all walls framed?

  • Has correct fire wall priority been followed?

  • Is track properly secured?

  • Is the proper slip track condition maintained at head of wall?

  • Is all framing on correct layout?<br>

  • Is all framing plumb? Square?

  • Are all headers, penetrations, rough openings framed properly?

  • Any damage to framing, failure to protect work, or other issues?

Cladding

  • All drawings, specs, RFI's checked for this area?

  • Rated assemblies adhere to specified UL requirements.

  • Bypass conditions

  • Screw patterns

  • Stagger at joints

  • Board is hung tight to deck

  • Proper cantilever condition at beams

  • Non-Rated assemblies hung per specs.

  • Screw patterns

  • Stagger at joints

  • Board hung to 6" above ceiling or to deck, where indicated

  • Any damage to cladding, failure to protect work, or other issues?

Hollow Metal Frames

  • All drawings, specs, RFI's checked for this area?

  • Was door properly installed, swing checked, and spanners removed?

  • Is door plumb, square and without sag?

  • Any damage to frames, failure to protect work, or other issues?

Finishing

  • All drawings, specs, RFI's checked for this area?

  • Do all levels of finish match contract document requirements?

  • Is finish consistent and free of defect?

  • Are all joints finished to 6" above indicated ceiling height?

  • Are joints on rated partitions fire taped to the deck?

  • Where indicated, Is acoustical sealant properly applied?

  • Base of wall

  • Head of wall

  • Penetrations

  • All room dimensions have been checked and are within tolerance.

  • Any damage to finish, failure to protect work, or other issues?

Soffits/Bulkheads

  • All drawings, specs, RFI's checked for this area?

  • Are all soffits plumb, level, and square?

  • All soffit dimensions have been checked and are within tolerance.

  • Board is hung to 6" above ceiling height?

  • Any damage, failure to protect work, or other issues?

Ceilings

  • All drawings, specs, RFI's checked for this area?

  • Is ceiling height clearly indicated in room?

  • Are all ceilings at indicated height?

Acoustical Ceilings

  • Are correct ACT components installed, per specification?

  • Is grid installed on proper layout, accounting for lights, diffusers, etc.?

  • Is edge mould properly installed, corners flush, free of defect?

  • If using directional tile, are all tiles facing the direction indicated in the contract documents?

  • Are all cut tiles cleanly installed?

Gypsum Board Ceilings

  • Do hard ceilings adhere to specifications for layout, framing, and cladding?

  • Any damage, failure to protect work, or other issues?

The templates available in our Public Library have been created by our customers and employees to help get you started using SafetyCulture's solutions. The templates are intended to be used as hypothetical examples only and should not be used as a substitute for professional advice. You should seek your own professional advice to determine if the use of a template is permissible in your workplace or jurisdiction. You should independently determine whether the template is suitable for your circumstances.