Title Page

  • Document No.

  • Quality Control Check

  • Conducted on

  • Prepared by

  • Location
  • Install Date

  • Tech Name

  • Tech Number

  • Job Number

  • Account Number

  • Customer Name

Tech Professionalism

  • Was the tech professional and courteous?

  • Was the tech's appearance professional and clean?

  • Did the tech arrive within the expected time window?

  • Did the tech review the customer's XH package and all available options for upgrade/downgrade, add ons, and up sales?

  • Customer Agreement

  • Responses
  • Did the tech Review the Agreement with Customer?

  • Did the tech Review the 30 Day MBG with the Customer?

  • Was the 7 day Familiarization Period Reviewed with the customer?

  • Was Customer Welcome Packet Filled Out?

  • Was the Contract Filled out and Signed?

  • Were the Alarm Permit Requirements Explained to the customer?

  • Was Customer Contact Information Completed?

  • Has the Customer Activated their Portal?

  • Emergency Contact Information Entered in Portal

  • Responses
  • CTV 1 (1st Blue Badge)

  • CTN 1 (1st White Badge)

  • CTV 2 (2nd Blue Badge)

  • CTN 2 (2nd White Badge)

  • Was the Password Entered in Touch Screen and Portal?

  • Response
  • Entered in Touch Screen

  • Entered in Portal

  • Alarm System Tested

  • Responses
  • Is Broadband Online?

  • Is Cell Online?

  • Has Wifi Signal Been Verified?

  • We're all signals verified in COPS?

  • Are all metrics passing in the Customer's AIP portal?

  • Was the Alarm System and Portal Features Demonstrated to the Customer?

  • Have Customer Answer Next Question and Sign.

  • Have all your services been installed to you satisfaction and are working correctly? Is your internet, Television, and phone working correctly?

  • Customer Signature

  • Hand IPad back to Technician

  • Was a thermostat installed?

  • Is the heat and AC currently functioning properly?

  • Did the tech install a Takeover/Panel Swap?

  • Attach Photo of Panel

  • Was the panel left in a clean and acceptable state?

  • Was the panel programmed properly?

  • Are there currently any faults on the panel's zones?

  • If a PIM was used, was it secured properly?

  • Does the panel adhere to power regulations in regards to total mA allowed (600 mA)?

  • Did the tech Install any Outdoor Cameras?

  • Attach Photo of Outdoor Camera

  • Was the camera(s) mounted securely?

  • Was a wall bushing or silicone used as needed?

  • Was the camera(s) mounted in an acceptable area (privacy policy)?

  • Did the tech do any wall fishes?

  • Attach Photos of any wall fishes

  • Was a wall bushing or silicone used as needed?

  • Were any excess holes created during the wall fishing process?

  • Attach photos of excess holes created

  • Does the transformer come out directly behind the wall outlet?

  • Did the tech do any outlets?

  • Attach photos of any outlets

  • Were staples used in the outlet run?

  • Were flex clips used in the outlet run?

  • Is the CAT5E wire run taut and neat?

  • Were all sensors/devices mounted properly?

  • Was the customer given the option to use silicone, mounting tape, or screws for the installation of mounted devices?

  • Was the customer asked where they would like to have their devices installed/mounted?

The templates available in our Public Library have been created by our customers and employees to help get you started using SafetyCulture's solutions. The templates are intended to be used as hypothetical examples only and should not be used as a substitute for professional advice. You should seek your own professional advice to determine if the use of a template is permissible in your workplace or jurisdiction. You should independently determine whether the template is suitable for your circumstances.