Title Page
-
Document No.
-
Quality Control Check
-
Client / Site
-
Conducted on
-
Prepared by
-
Location
-
Personnel
-
Install Date
-
Tech Name
-
Tech Number
-
Job Number
-
Account Number
-
Customer Name
-
Customer Agreement
Responses
-
Did you Review Agreement with Customer
-
Did you Review the 30 Day MBG with Customer
-
Was Customer Contact Information Completed
-
Was Customer Welcome Packet Filled Out
-
Was the Contract Filled out and Signed
-
-
Was the 7 day Familiarization Period Reviewed
-
Was the Alarm Permit Requirements Explained
-
Has the Customer Activated their Portal
-
Emergency Contact Information Entered in Portal
Responses
-
CTV 1 (1st Blue Badge)
-
CTV 2 (2nd Blue Badge)
-
CTN 1 (1st White Badge)
-
CTN 2 (2nd White Badge)
-
Password Entered in Touch Screen and Portal
Response
-
Entered in Touch Screen
-
Entered in Portal
-
Alarm System Tested
Responses
-
Is Broadband Online
-
Is Cell Online
-
Has Wifi Signal Been Verified
-
We're all signals verified in COPS
-
Was the Alarm System and Portal Features Demonstrated to the Customer
-
Technician Signature
-
Have Customer Answer Next Question and Sign.
-
Have all your services been installed to you satisfaction and are working correctly? Is your internet, Television and phone working correctly?
-
Customer Signature
-
Hand IPad back to Technician
-
Did you Install a Thermostat?
-
Was Thermostat heat and cooling working before installation?
-
Was Thermostat heat and cooling working after installation?
-
Technician Signature
-
Customer Signature
-
Comments
-
Did you install a Takeover/Panel Swap.
-
Attach Photo of Panel
-
Did you Install any Outdoor Cameras
-
Attach Photo of Outdoor Camera
-
Did you do any wall fishes
-
Attach Photo of any wall fishes
-
Make sure to attached a screenshot of your completed contract!
-
Attach screenshot of completed contract