Title Page
-
PM#
-
Prepared by
-
Foreman's Name
-
Conducted on
-
Location
-
Valid USA ticket?
-
Was a Tailboard Completed?
-
List Locations
Field Audit
Trench and Conduit
-
1. Depth of trench
-
2. Sand Bed/Shade
-
3. Backfill
-
4. Compaction Test Report
-
5. Wet Utility Clearance
-
6. Dry Utility Clearance
-
7. Shoring
-
8. EMS Marker Ball
-
9. End Balls
-
10. Pull Tape
-
11. Mandrel
-
12. Horizontal Directional Drilling
-
13. Cross Bore Inspection
Pad, Splice, Box, and Vault
-
14. Location Grade
-
15. Vehicle Access
-
16. Primary Enclosure
-
17. Secondary Enclosure / Splice Box
-
18. Aggregate
-
19. Compaction Test Results
-
20. Pre-Cast Pad
-
21. Poured Pad
-
22. Dry Vault
-
23. Lid Adjustment Bolt / Support Bracket
-
24. Lid Grounded
-
25. Ground Rod Instrument / Grounding
-
26. Caulking
-
27. Conduit Couplings / Glue
-
28. Clearance Working Space
-
29. Retaining Wall
-
30. Ground Rod, Clamp, and Ufer
-
31. Hardware (Bolt, anchors, and lids)
-
32. Barrier Post / Diameter / Visibility Strips
-
33. Landscaping Obstructions
Inspector Notes:
-
Add any notes below.
-
Civil Inspectors Name