Title Page

  • PM#

  • Prepared by

  • Foreman's Name

  • Conducted on

  • Location
  • Valid USA ticket?

  • Was a Tailboard Completed?

  • List Locations

Field Audit

Trench and Conduit

  • 1. Depth of trench

  • 2. Sand Bed/Shade

  • 3. Backfill

  • 4. Compaction Test Report

  • 5. Wet Utility Clearance

  • 6. Dry Utility Clearance

  • 7. Shoring

  • 8. EMS Marker Ball

  • 9. End Balls

  • 10. Pull Tape

  • 11. Mandrel

  • 12. Horizontal Directional Drilling

  • 13. Cross Bore Inspection

Pad, Splice, Box, and Vault

  • 14. Location Grade

  • 15. Vehicle Access

  • 16. Primary Enclosure

  • 17. Secondary Enclosure / Splice Box

  • 18. Aggregate

  • 19. Compaction Test Results

  • 20. Pre-Cast Pad

  • 21. Poured Pad

  • 22. Dry Vault

  • 23. Lid Adjustment Bolt / Support Bracket

  • 24. Lid Grounded

  • 25. Ground Rod Instrument / Grounding

  • 26. Caulking

  • 27. Conduit Couplings / Glue

  • 28. Clearance Working Space

  • 29. Retaining Wall

  • 30. Ground Rod, Clamp, and Ufer

  • 31. Hardware (Bolt, anchors, and lids)

  • 32. Barrier Post / Diameter / Visibility Strips

  • 33. Landscaping Obstructions

Inspector Notes:

  • Add any notes below.

  • Civil Inspectors Name

The templates available in our Public Library have been created by our customers and employees to help get you started using SafetyCulture's solutions. The templates are intended to be used as hypothetical examples only and should not be used as a substitute for professional advice. You should seek your own professional advice to determine if the use of a template is permissible in your workplace or jurisdiction. You should independently determine whether the template is suitable for your circumstances.