Title Page

  • Site conducted

  • Job Number

  • Conducted on

  • Location

GENERAL

  • Builder's Sign on site visible

  • Bin on site

  • Toilet is clean and tidy

  • Site safety management plan check

CARPENTER/FRAME

  • Ensure termite treatment is installed to perimeter & boundary

  • Make sure the void scaffold has been ordered

  • Window & Scaffold orders/deliveries have been confirmed with Site Supervisor

  • Structural steel as per Engineering layout & connections

  • Void scaffold installed

  • Roof trusses inspection & check A/C / Truss / Trim / Reg 74

  • Call up for roller door measure

  • Gate to scaffold installed

  • Site to be left clean & tidy

Acknowledgement

  • I have read and understood the requirements of this audit based on Rivergum Homes policies & procedures

The templates available in our Public Library have been created by our customers and employees to help get you started using SafetyCulture's solutions. The templates are intended to be used as hypothetical examples only and should not be used as a substitute for professional advice. You should seek your own professional advice to determine if the use of a template is permissible in your workplace or jurisdiction. You should independently determine whether the template is suitable for your circumstances.