Title Page
-
Site conducted
-
Job Number
-
Conducted on
-
Location
GENERAL
-
Builder's Sign on site visible
-
Bin on site
-
Toilet is clean and tidy
-
Site safety management plan check
CARPENTER/FRAME
-
Ensure termite treatment is installed to perimeter & boundary
-
Make sure the void scaffold has been ordered
-
Window & Scaffold orders/deliveries have been confirmed with Site Supervisor
-
Structural steel as per Engineering layout & connections
-
Void scaffold installed
-
Roof trusses inspection & check A/C / Truss / Trim / Reg 74
-
Call up for roller door measure
-
Gate to scaffold installed
-
Site to be left clean & tidy
Acknowledgement
-
I have read and understood the requirements of this audit based on Rivergum Homes policies & procedures