Title Page

  • Site conducted

  • Job Number

  • Conducted on

  • Location

GENERAL

  • Builder's Sign on Site and Visible

  • Bin on Site

  • Site Safety Management Plan check

  • Check services installed in correct location

PAVING

  • Ensure adequate set down from finish floor (minimum 50mm)

  • Viscourse is installed and trimmed

  • Ensure floor gully is 50mm below finished floor level and is taped off to avoid blockage

  • Ensure falls are adequate, 1 in 20 minimum for first metre from wall

  • Paving pattern installed as per selections sheet

  • Paver colour and thickness as per selection sheet

  • Paving sand and haunching installed

  • All sewer and stormwater IPS installed and covered (150mm bolted trap screw)

  • All stormwater grates (grey) to be installed

CONCRETING

  • Ensure services installed where required

  • Ensure adequate set down from finish floor (minimal 50mm)

  • Termite treatment (installed where required)

  • Installed as per selection sheet & landscaping plan

  • Ensure junting/edges are left neat clean

  • Ensure crossover/inverts are completed where required

  • Ensure all concrete splashes are cleaned off appropriately

  • Trim viscourse to top of concrete and Ableflex around stormwater

  • Rainwater tank pads to be concrete only

  • Remove any drag out to roads immediately

ACKNOWLEDGEMENT

  • I have read and understood the requirements of this audits as stated in Rivergum Homes Policies and Procedures

The templates available in our Public Library have been created by our customers and employees to help get you started using SafetyCulture's solutions. The templates are intended to be used as hypothetical examples only and should not be used as a substitute for professional advice. You should seek your own professional advice to determine if the use of a template is permissible in your workplace or jurisdiction. You should independently determine whether the template is suitable for your circumstances.