Title Page
-
Site conducted
-
Job Number
-
Conducted on
-
Location
GENERAL
-
Builder's Sign on Site and Visible
-
Bin on Site
-
Site Safety Management Plan Check
FIXING
-
Check void scaffold is safe
-
Hole saw to all plumbing penetrations
-
All plasterboard to be a maximum 10mm from all wet area floors (including WC)
-
Check adequate fixings for full height tiling - All board in within 10mm in all wet area of the floor
-
Control joints installed as required by code
-
Square set to canopy range hoods and fridge openings
-
Reinstate temp balustrade if required
-
Contact void scaffold installer to reinstate void scaffold
-
Niche lights to be double layered at top
-
All niches must be square
FLUSHING
-
Garage floor must be clean, treated as finished floor & protected
-
Check no metal corners in wet area niche
-
Flush nails in shower
-
Check sanding is thorough
-
Check if extra flushing required after sanding
-
Metal angles above roller door openings
-
Gyprock capping to roller door opening/walls and brick pier
-
Garage ceilings to be fixed as per manufactures specification
-
All floors to be fully scraped and swept, place in bin and bath is protected
-
Cornice to go over full height tiles at top - grout must be kept clan
-
Remove cornice residue from kitchen cupboards and doors
-
Flushing compound on windows/sliding doors must be cleaned off by flusher
ACKNOWLEDGEMENT
-
I have read and understood the requirements of this inspection as stated in Rivergum Homes Policies and Procedures