Title Page

  • Site conducted

  • Job Number

  • Conducted on

  • Location

GENERAL

  • All roller doors installed as per selections sheet

  • All tracks screwed/bolted as required

  • Ensure motor chord reaches power point

  • Check for dents/damage

  • Ensure locking mechanism is in working order

  • Install bushfire seals

  • Ensure door is sealed at bottom to rebate

  • Check track is fitted without damage to wall

ACKNOWLEDGEMENT

  • I have read and understood the requirements of this inspection as stated in Rivergum Homes Policies and Procedures

The templates available in our Public Library have been created by our customers and employees to help get you started using SafetyCulture's solutions. The templates are intended to be used as hypothetical examples only and should not be used as a substitute for professional advice. You should seek your own professional advice to determine if the use of a template is permissible in your workplace or jurisdiction. You should independently determine whether the template is suitable for your circumstances.