Title Page

  • Site conducted

  • Job Number

  • Conducted on

  • Location

GENERAL

  • Builder's Sign on Site and Visible

  • Bin on Site

  • Toilet is clean and tidy

  • Site Safety Management Plan check

CHECKLIST

  • Ensure sewer & stormwater is installed (if applicable) & capped as per civil plan

  • Ensure power, water, NBN, gas (meter to house)

  • All spoil (footings & services) to be removed from site if spoil removal has been requested

  • Spoil to be stockpiled if no spoil removal has been requested (check if location has been requested)

  • 250mm dig out from FFL and backyard considered for boundary builds

  • 50mm rubble 1 meter around house & driveway with fall away from house. Create rubble ramp at front and roller door entry

  • Scrape and sweep footpath slab, road & curb when complete

  • If Rivergum completing landscaping to rear, ensure dig out is sufficient and if there is a need to pre-load any materials

  • Ensure termite treatment is installed to perimeter and boundary if required

ACKNOWLEDGEMENT

  • I have read and understood the requirements of this inspection as stated in Rivergum Homes Policies and Procedures

The templates available in our Public Library have been created by our customers and employees to help get you started using SafetyCulture's solutions. The templates are intended to be used as hypothetical examples only and should not be used as a substitute for professional advice. You should seek your own professional advice to determine if the use of a template is permissible in your workplace or jurisdiction. You should independently determine whether the template is suitable for your circumstances.