Title Page

  • Site conducted

  • Job Number

  • Conducted on

  • Location

GENERAL

  • Builder's Sign on Site and Visible

  • Bin on site

  • Site Safety Management plan Check

TURNKEY ITEMS

  • Landscaping completed as per landscaping plan

  • Irrigation is fully operational and timers set appropriately (seasonal)

  • Lawn has adequate base and laid appropriately

  • All edging is straight and level

  • All fencing/gates are installed as per contract/landscaping plan - No fixing to AAC walls

  • All retaining walls/plinth installed as per contract/landscaping plan

  • All AG drains installed as required

  • Letterbox installed with numbers fitted

  • Clothes line installed as per selection sheet and landscaping plan

  • Rainwater tanks installed as per selection sheet and landscaping plan

  • Blinds installed as per selection sheet - all plastic covers removed

  • Site to be left clean and tidy

ACKNOWLEDGMENT

  • I have read and understood the requirements of this inspection as stated in Rivergum Homes Policies and Procedures

The templates available in our Public Library have been created by our customers and employees to help get you started using SafetyCulture's solutions. The templates are intended to be used as hypothetical examples only and should not be used as a substitute for professional advice. You should seek your own professional advice to determine if the use of a template is permissible in your workplace or jurisdiction. You should independently determine whether the template is suitable for your circumstances.