Information
-
Site Name
-
Site LRD Code (SMR)
-
Date
-
Technician
-
Technician Initials
Photo Audit
Internal Power Work Photos
-
1) Power System Rack (LOD,SP 18)
-
2) Battery String (Overall and individual view of Battery Strings)
-
3) Batteries (with readable labels)
-
4) Rectifiers( quantity and labels)
External Power System
-
1) Solar Panels Overall (Front + Rear)
-
2) Generator
-
3) Fuel tank
-
4) Cabling between the components
-
5) Battery Racks (Closed and Open doors)
-
6) Solar Regulator